Chapter 3
Using DC Power
3-9
FIGURE 3-9
Assembling the Strain Relief Housing
What’s Next?
The DC input power cables for your server are now completely assembled. For
information about connecting the power cords and other cables, see Chapter 6. Do
not power on the server (see Chapter 7) until you have installed any optional
hardware components you need (see Chapter 4) and until you have installed the
server securely into a rack or cabinet (see Chapter 5).
Содержание Netra 120
Страница 10: ...x Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 14: ...xiv Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 16: ...xvi Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 22: ...xxii Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 23: ...PART I Installation and Configuration...
Страница 24: ......
Страница 28: ...1 4 Sun Fire V120 and Netra 120 Server User s Guide December 2001 FIGURE 1 2 Contents of the Ship Kit...
Страница 48: ...3 10 Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 64: ...4 16 Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 99: ...PART II Remote and Local Management...
Страница 100: ......
Страница 124: ...8 24 Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 138: ...9 14 Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 139: ...PART III Troubleshooting and Maintenance...
Страница 140: ......
Страница 154: ...10 14 Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 177: ...PART IV Appendixes...
Страница 178: ......
Страница 184: ...A 6 Sun Fire V120 and Netra 120 Server User s Guide December 2001...
Страница 192: ...C 6 Sun Fire V120 and Netra 120 Server User s Guide December 2001...