Site-Preparation Process
The Cluster Platform 15K/9960 system has various physical and environmental
requirements. Review the site preparation process flow diagram shown in
as you begin to evaluate the needed requirements.
FIGURE 1-1
Site Preparation Process
Obtain system
configuration from
sales engineer.
Determine the amount of cooling
needed by reviewing the system
cabinet power and cooling
requirements.
Determine the type and amount
of power receptacles needed.
Determine the type and amount of
networking cables needed.
Determine the space
requirements and location of
the system.
Schedule all necessary
modifications and obtain
any necessary hardware.
Plan for equipment arrival
Complete and review all
worksheets and checklists in
Chapter 6, "Site Planning Checklist."
Schedule the installation date based
on the anticipated completion date of
site and system arrival.
For Sun™ service personnel, fill out and
return the electronic Installation Report,
http://esp.West.Sun.COM/sunfire1
5k_hw_pubs/02_Install_Report/
Содержание 15K/9960
Страница 4: ...Please Recycle...
Страница 8: ...viii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 10: ...x Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 12: ...xii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 14: ...xiv Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 20: ...xx Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 22: ...2 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 28: ...8 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 32: ...12 Cluster Platform 15K 9960 System Site Planning Guide January 2002...