16
Cluster Platform 15K/9960 System Site Planning Guide • January 2002
3. Attach the ground cable to the system.
For the grounding locations for the expansion cabinet, refer to the Sun StorEdge
Expansion Cabinet Installation and Service Manual. For the grounding location for the
Sun Fire 15K server, refer to the Sun Fire 15K Site Planning Guide. For the grounding
location for the Sun StorEdge 9960 storage system, refer to the Hitachi Freedom
Storage Lighting 9900 User and Reference Guide.
The ground cable attaching area may be a painted surface. Ensure metal-to-metal
solid contact is made for this installation.
Содержание 15K/9960
Страница 4: ...Please Recycle...
Страница 8: ...viii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 10: ...x Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 12: ...xii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 14: ...xiv Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 20: ...xx Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 22: ...2 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 28: ...8 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 32: ...12 Cluster Platform 15K 9960 System Site Planning Guide January 2002...