Chapter 2
Physical Specifications
5
For detailed physical specifications of the expansion cabinet, refer to the Sun
StorEdge Expansion Cabinet Installation and Service Manual. For detailed physical
specifications of the Sun Fire 15K server, refer to the Sun Fire 15K Site Planning Guide.
For detailed physical specifications of the Sun StorEdge 9960 storage system, refer to
the Hitachi Freedom Storage Lighting 9900 User and Reference Guide.
Raised Floor Installations
A raised floor system provides a convenient way to duct cooling air and to route
power and communication cabling. Sun strongly suggests that the system be
installed on a raised floor to ensure that optimal cooling is available to the system.
The computer room floor must be able to support the weight of the system cabinets.
Place perforated floor panels or floor grilles near or directly under the base of the
system. Suggested locations for perforated floor panels or floor grilles are shown in
“Computer Room Layout” on page 11. Use the floor layout diagram of the proposed
location for the system to determine the exact area required for your system. Ensure
the cabinets are positioned so that all casters and leveling feet are on solid raised-
floor tiles.
Sun suggests a minimum raised floor height of 24–36 in. (61.0–91.5 cm).
Storage controller
Height
Width
Depth
Weight
70.5 in.
23.6 in.
31.5 in.
1058 lbs.
Server 1 and 2 (each)
Height
Width
Depth
Weight
75.5 in.
33.3 in.
66.2 in.
1883.2 lbs.
Expansion cabinet
Height
Width
Depth
Weight
73.5 in.
24 in.
36.5 in.
450 lbs.
TABLE 2-1
Physical Specifications for the Cluster Platform 15K/9960 System (Continued)
Characteristic
Specification
Содержание 15K/9960
Страница 4: ...Please Recycle...
Страница 8: ...viii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 10: ...x Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 12: ...xii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 14: ...xiv Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 20: ...xx Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 22: ...2 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 28: ...8 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 32: ...12 Cluster Platform 15K 9960 System Site Planning Guide January 2002...