6
Cluster Platform 15K/9960 System Site Planning Guide • January 2002
Non-Raised Floor Installation
If you are not installing your system on a raised floor, ensure the cooling
requirements specified in
can be met. Use cable covers to protect personnel
from injury and protect cables from damage.
Note –
If the cooling to the system is inadequate, automatic system shutdown can
result.
Planning Your Access Route
For best performance, locate the system cabinets over perforated floor tiles as
indicated in “Computer Room Layout” on page 11.
Caution –
To prevent damage to system cabinets and injury to personnel, a 60-in.
pallet jack can only be used at the narrow end of the pallet and a forklift can only be
used at the wide side of the pallet.
If your existing loading dock meets height or ramp requirements for a standard
freight carrier truck, you can use a standard 60-inch pallet jack (at narrow end of
pallet) to unload the system cabinets. If not, use a standard forklift (at wide side of
pallet) or other means to unload the system, or request the system to be shipped in a
truck with a lift gate. A standard forklift has a maximum outside tine dimension of
27 in. (68.6 cm) and a minimum inside tine dimension of 15 in. (38.1 cm).
Sun suggests that you leave each system component in its shipping crate until it
reaches its unpacking destination. If the system component does not fit through the
planned access route, it can be partially disassembled after the unit has been
removed from the crate.
Содержание 15K/9960
Страница 4: ...Please Recycle...
Страница 8: ...viii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 10: ...x Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 12: ...xii Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 14: ...xiv Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 20: ...xx Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 22: ...2 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 28: ...8 Cluster Platform 15K 9960 System Site Planning Guide January 2002...
Страница 32: ...12 Cluster Platform 15K 9960 System Site Planning Guide January 2002...