![Sumitomo TYPE-72M12 Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/sumitomo/type-72m12/type-72m12_manual-to-operation_1390674049.webp)
2-23
2.Basic splicing operation
|
Optical fiber splicing
2. Basic splicing operation
If Auto start heating is set to ON,
the heating operation is
automatically started when the
fiber is placed into the heat shrink
oven.
4: Press the Heater key (
) or tap
the Heater icon (
).
The heat cycle is started.
If you would like to cancel the
heating process, press the Heater
key (
) or tap the Heater icon
(
) again.
OK
NG
Heater 2
Heater 1
Heater 1
Heater 2
When lowering the fiber onto the heat
shrink oven, use the markings on the heat
shrink oven as a reference.
60mm
40mm
Marking for the center of
the heat shrink oven
1: Open the heat shrink oven lid and
the heat shrink oven clamps.
(
▸
P.7-3 Heater clamp operation)
2: Open the hood and lid of fiber holders.
Take out the spliced fiber. Do not flex
and bend it.
Slide the protection sleeve (
▸
P.2-19 )
over the center of the splice.
3: While keep applying a slight tension
to the left and right fibers, lower
them onto the heat shrink oven.
The oven lid and oven clamps close
accordingly.
●
Splice Protection