10
C)
INSTALLING YOUR SYSTEM PNEUMATICALLY (See Figure 2)
Install the dryer where the ambient air is as clean as possible and where the air temperature will never exceed
the dryers temperature limits.
PNEUMATIC CONNECTIONS
Connect the Inlet (1) and Outlet (2) compressed air lines to the valve housings marked Inlet and Outlet, ensuring
the protective dust covers fitted to the flanges on the dryer are removed prior to connection.
MANIFOLD & DRAINS
On installations with fabricated manifolds, an automatic drain valve must be fitted at the lowest point of the inlet
manifold to prevent condensate from entering the dryer.
Figure 2 - TYPICAL SINGLE BANK INSTALLATION
6
2
4
3
5
1
9
7
8
8
Содержание SM-1100N
Страница 1: ...SM160N SM1650N DESICCANT AIR DRYERS Installation Maintenance Instructions...
Страница 2: ......
Страница 7: ...5 3 UNPACKING 1 2 3 4...
Страница 8: ...6 7 5 6...
Страница 23: ...21 INSPECTION EXAMINATION REPAIR MAINTENANCE IF ANY Name Signature Date Summary Remarks...