17
Dimensions in parentheses are in
millimeters unless otherwise specified.
To help with the placement of the drawer
panels, examine the lower ’L’ bracket and
panel to determine the slotted holes on the
bracket that will be used. Then position screws
into the lower portion of the drawer that
correspond with these slots. Leave these
screws out just enough that the slotted holes
in the bracket will slide under the heads.
With the two mounting brackets in place,
install the drawer panel by engaging the top
tabbed bracket first, then slide the lower ’L’
bracket onto the positioning screws. Each
drawer panel can be adjusted
1
/
4
" (6) up and
down and side to side. Fasten all screws to the
lower ’L’ bracket to secure the drawer panel.
Refer to illustration 16 on page 16.
IMPORTANT NOTE: Once drawer panels have
been adjusted for proper spacing, be sure to
reconnect the control cable on the base unit
only after you have installed the drawer. Refer
to illustration 3 on page 10.
D UA L
I N S T A L L A T I O N S
When two Integrated units are installed closer
than 2" (51) to one another, it is necessary to
use the Sub-Zero dual installation heater kit
(BBDUAL or TTDUAL). The heater plate from
this kit must be attached to the left side
exterior of the right hand unit before the units
are slid into position.
Contact your Sub-Zero dealer for the proper
components and installation instructions.
For questions relative to the installation, call
Sub-Zero at 800-222-7820.
9 0 - D E G R E E
D O O R S T O P
All Integrated tall units have a 90˚ door stop
built into the hinge system. Use the blade edge
of a standard screwdriver and rotate the brass
cam in the center portion of the hinge until
you reach the stop. You must make this adjust-
ment to both the bottom and top hinge. Refer
to illustration 17 below.
I N T E G R AT E D
I N S T A L L A T I O N I N S T R U C T I O N S
Illus. 17
O P T I O N A L
C O M P O N E N T S
Optional installa-
tion components
are available
through your
Sub-Zero dealer.
You can also visit
our website at
subzero.com. For
questions relative
to the installation,
call Sub-Zero at
800-222-7820.
Exercise caution when drilling holes for
mounting hardware. This is especially
critical with inset panels.