18
I N S TA L L AT I O N
C H E C K L I S T
The importance of the installation of the
Sub-Zero Integrated unit cannot be
overemphasized. Proper installation is the
responsibility of the selling dealer or installer.
IMPORTANT NOTE: To ensure a safe and
proper installation, the following checklist
should be completed by the installer to ensure
that no part of the installation has been
overlooked.
Advise the homeowner to fill out and return all
product registration forms. This will ensure
that the customer information is in our
database in the event service is required.
Any questions or problems about the installa-
tion should be directed to your Sub-Zero
dealer or the Sub-Zero Customer Service
Department at 800-222-7820. You can
also visit our website at subzero.com.
I N S TA L L AT I O N
C H E C K L I S T
I N S T A L L A T I O N C H E C K L I S T
Has the anti-tip bracket been installed
properly and is it making contact with
the unit?
Is the unit level? Are all leveling legs
making contact with the floor?
Is the power cord plugged into a properly
grounded 3-prong outlet, which has been
installed in accordance with all applicable
electrical codes?
Is the water supply connected for units with
an automatic ice maker? Have you checked
for leaks?
Has the kickplate / grille been installed
properly?
Are panels attached securely and properly
aligned?
Has the door been aligned for proper
appearance and operation?
Have all accessories been installed?
Have any installation or service problems
been noted on the product registration
card? Has the registration card been
mailed in?
Have stainless steel panels been inspected
for any imperfections? This is to be done by
the dealer or installer with the customer
upon completion of the installation.
NOTE: Classic, platinum and carbon stain-
less steel panels are covered by a limited
60-day parts and labor warranty for
cosmetic defects.