Maintenance
Procedures
Chapter 4
45
CPR MICRO SWITCH REPLACEMENT
Required Tools:
#1 Phillips Screwdriver
Phillips Screwdriver
Procedure:
1. Raise the bed fully up and apply the brakes.
2. Raise the head siderails.
3. Raise the head section approximately 45°.
4. Unplug the bed power cord from the wall outlet.
•
Micro Switch Attached to the Head Section Lever
This switch informs on the state of the Fowler actuator (engaged or disengaged) when the CPR
emergency release is activated.
5. Using a #1 Phillips screwdriver, remove the two screws (A) holding the micro switch to the
head section lever. Keep the mounting plate (B). Remove the defective micro switch.
6. Remove the cable wires from the micro switch. Note the location of the wires so they will be
connected correctly to the new micro switch.
7. Reverse the above steps to install the new micro switch.
8. Test the CPR positioning before returning the bed to service.
A
B
C
D
E
F
G
H
J
I
K
L
M
N
N
Figure 4.3H
L
G
Содержание FL25E
Страница 2: ......
Страница 52: ...Appendix A Circuit Diagrams 52 Appendix A Circuit Diagrams A Can Control Board Motor Control Page 1 of 2 ...
Страница 54: ...Appendix A Circuit Diagrams 54 B Power Supply ...
Страница 55: ...Appendix A Circuit Diagrams 55 C Communication Interface Optional ...
Страница 56: ...Appendix A Circuit Diagrams 56 D Scale Optional ...