www.stryker.com
836004-5210 V1.1
7
Service
5.
Take out the main PCBA. Replace with a new one and discard the old one.
6.
The wire connections on the main PCBA are as below.
7.
After replacement, perform pressure calibartion. Refer to Pressure Calibration section.
4.
Remove the 2 screws and all wire connections on the main PCBA.
3.
Remove wire connections between power switch and main PCBA, front panel PCBA and main PCBA .
Take out the module set from the case.