6
INSTALLATION: GLASS SHELVING / ELECTRICAL CONNECTIONS
4. Glass Shelving
Glass shelving will be packed separately.
•
Caution! Carefully remove from packaging.
•
Grasp firmly and carefully install.
•
Caution! Check that plastic edging is intact
before placing glass shelving onto brackets!
•
Plastic edging must NOT be removed from
glass shelves. Contact Structural Concepts for
replacement edging (see
TECHNICAL
SERVICE CONTACT INFORMATION
section).
•
Check that glass shelving is in proper position
before placing product in case.
•
See illustration at mid-right.
5. Electrical Connections
Remote Units
•
Remove front or rear panel (by removing
screws and lifting off case)
-------- Remote Unit --------
Knockouts
Glass
Shelves
•
Knockouts are located on side and rear of
electrical box.
•
Single phase leads are provided.
•
See serial label (at case rear) for voltage rating.
•
See illustration at lower-right.
Self-Contained Units
Field wiring connection / junction box location is at
rear-right of case.
•
See illustration at below-left.
•
Single phase leads are provided.
•
Plug unit into wall outlet.
•
See serial label (at case rear) for voltage rating.
Note:
Wiring process must be performed by
certified electricians only.
-------- Self-Contained Unit --------