7
ADJOINMENT GUIDE: LOWERING FRONT PANEL FOR END PANEL ADJOINMENT
Adjoinment Guide
1. Lowering Front Panel
•
Lowering front panel allows screws to be inserted
through inner end panels and into adjacent cases.
•
To do so, you must first remove two (2) screws from
brackets located at front underside of case.
•
Number of brackets vary depending upon case
length.
2. Adjoining End Panels
•
Use wood screw to attach to adjacent case.
•
After adjoinment screw has been attached, raise
front panel back up and reattach (2) screws in each
bracket.
•
Drill bits and screws are provided in lineup kit.
•
Number of brackets vary depending upon case
length.
*
Inner End Panel
Adjoinment Spot (At
Both Ends) After Front
Panel Is Lowered
Screw Locations (Remove To
Lower The Front Panel)
2
1
1
1
Note: Model FB9S-6HO.7355 (shown)
may not exactly reflect every feature or
option of your particular case.
Содержание grocerant FB9S-6HO.7355
Страница 27: ...27 ALTO SHAAM HEATED BUFFET WELLS OPERATING INSTRUCTIONS Operating Instructions...
Страница 29: ...29 ALTO SHAAM HEATED BUFFET WELLS CARE AND CLEANING PAGE 1 of 2 Care and Cleaning...
Страница 30: ...30 ALTO SHAAM HEATED BUFFET WELLS CARE AND CLEANING PAGE 2 of 2 Care and Cleaning...
Страница 31: ...31 ALTO SHAAM HEATED BUFFET WELLS FOOD SAFETY Food Safety...
Страница 32: ...32 ALTO SHAAM HEATED BUFFET WELLS LIMITED WARRANTY CONTACT INFORMATION Limited Warranty Contact Information...