13
=
TECHNICAL PASSPORT, INSTALLATION AND MAINTENANCE INSTRUCTION
6.2
Connection diagram of
„Stropuva“ boiler to another boiler, water
heater and floor heating
Figure 11
1. Triple D25
- 10 pcs.
18. Filling valve
i/i 1/2“
- 1 pcs.
2. Triple D25 x D15
- 3 pcs.
19. Release valve 1/2
- 1 pcs.
4. Elbow D25 V/i
- 2 pcs.
20. Brass disc valve
V/V 1“
- 2 pcs.
5. Nipple D25
- 15 pcs.
21. Adapter D32 x D25
- 2 pcs.
6. Adapter D25 x D15
- 3 pcs.
22. Thermostatic valve
- 1 pcs.
7. Circulation pump installation
kit
D25
- 1 pcs.
23. Valve 1,5 bar
- 1 pcs.
8. Separable connection D25 V/i
- 2 pcs.
F -
to/out of floor heating
9. Automatic bleeding device
- 1 pcs.
B
- to/out of water tank
10. Balance valve D25 V/i
- 1 pcs.
K2
- to/out of other boilers
.
11. Horizontal monometer
1/4“
- 1 pcs.
12. Adapter
D15 x 1/4“
- 1 pcs.
.
13. Ball valve
V/i 1“
- 3 pcs.
14. Circulation pump
- 1 pcs.
.
15. Thermostatic head 20 - 50 °C
- 1 pcs.
For boilers S7, S10, S12, S20, S7 BIO, S10 BIO, S20 BIO and S10U, S12U, S20U, nodes are
assembled from parts D20. For boilers S30, S30 BIO and S30U, S40, S40 BIO and S40U nodes
are assembled from parts D25.