Page 12 of 19
Step 10: Secure Upper Tray
Step 10 Hardware Needed:
8
– Hex Bolt 5/16” x 3/4” (D)
8
– Flat Washer 5/16” (M)
8
– Lock Nut 5/16” (K)
Attach both End Plates (3) to the
Top Tray using Hex Bolt
5/16” x 3/4”
(D), Flat Washer
5/16” (M), and Lock
Nut 5/16” (K) for each corner
(2 connections per corner).
Repeat for each corner.
Do not fully tighten until final step.
See Figure 10.
Step 11: Attach Lift Handle
Step 11 Hardware Needed:
1
– Lift Handle (4)
1
– Hex Bolt 5/16 x 1” (E)
1
– Lock Nut 5/16” (K)
Place the Lift Handle (4) through the large
opening in the tray slot. Attach the Lift
Handle (4) to the Wheel Bracket (9)
(see preassembly in Step 2)
, use
Bolt
5/16” x 1” (E) and Lock Nut 5/16” (K).
Insert Hex Bolt 5/16” x 1” (E) and Lock
Nut 5/16” (K) into top hole of Lift Handle.
Fully tighten connections.
See Figure 11.
Step 12: Check Handle & Tighten
fasteners
Carefully place the Aerator upright on the
wheels.
Check that lift handle moves freely within slot.
IF NEEDED, make following adjustments:
Lock the lift handle by moving into large offset
hole in front of tray slot, and then secure with
Lock Pin (F).
Refer to Figure 12.
For #1 in Figure 12:
Adjust the Top Tray side to side until the Lift
Handle moves freely from back to front.
5/16” x 3/4” Hex Bolt
Figure 10
Figure 11
Содержание 49167
Страница 14: ...Page 14 of 19 Parts Diagram ...