12
5. Turn release valve (50) clockwise to the closed position and check for proper pump action. It may be
necessary to perform the above step more than once to assume air is evacuated totally.
6. Jack is now ready for use.
BEFORE USE
1. Before using this product, read the owner's manual completely and familiarize yourself thoroughly
with the product and the hazards associated with its improper use.
2. Perform the air purge procedure. (See previous instructions for system purge procedure.)
3. Inspect before each use. Do not use if bent, broken or cracked components are noted.
OPERATION
All numbers in parenthesis () refer to the index number from the parts breakdown.
1. Adjust the bearing pins (8) to desired height. Ensure bed frame is fully rested on the bead frame
pins.
Содержание 47036
Страница 21: ...21 ASSEMBLY DIAGRAM ...
Страница 23: ...23 BOTTLE JACK ASSEMBLY DIAGRAM ...