10
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
All numbers in parenthesis () refer to the index number from the parts breakdown.
Perform the following Air Purge Procedure to remove any air that may have been introduced into the
hydraulic system as a result of product shipment and handing. This step is to be completed without and
weight on the jack.
1. Turn release valve clockwise to the closed position.
2. Pump the handle (54) until the ram reaches maximum height and continue to pump several times to
remove trapped air in the ram.
Содержание 47036
Страница 21: ...21 ASSEMBLY DIAGRAM ...
Страница 23: ...23 BOTTLE JACK ASSEMBLY DIAGRAM ...