8.
Mounting the hydraulic group
Connect the gas header to the gas connecting sets.
Connect the flow header to the flow connecting sets.
Connect the return header to the return connecting sets.
Mount all headers with the clamps to the frame.
All lines/piping must be mounted free of tension.
The weight of all the components should be supported separately of the boiler so there is no force on the
connections.
This might influence the mounting position of the boiler.
When all parts are mounted in the right place, and are free of tension, fasten all couplings and fasten the
clamps.