When cascade connection is programmed correctly the boiler display will show the following.
Explanation "Cascade communication indicator"
NO CASCADE COMMUNICATION
> > >
no.1
Always showing the fixed ">>>"
CORRECT CASCADE COMMUNICATION
> >
no.1
no.2
>
Showing alternating no.1 & no.2 with 1 second interval.
12.4
Monitor screens
During normal operation and stand-by, the “◄” and “►” buttons can be used to show some boiler
information, including measured temperatures, settings and data. In the following graphs is explained which
cascade information (screen 11 +12) can be shown in the display.
When no button is activated for 2 minutes the display will return to its status display.
Pressing [◄] or [►] while being at the "operating screen" toggles through the screens below.
When pressing [ON/OFF, RESET, ENTER] or [MENU] at any time the display returns to the base menu.
SCREEN
11
C a s c D e s i g n
0
0 = MASTER, 1 ..... 11 = SLAVES
C a s I n f
0 1 2 3 4 5 6 7 8 9 A B
Displays number, priority and state of cascade boilers.
SCREEN
12
C a s c P o w e r 9 9 9 % 9 9 9 %
% heat demand of total (cascade) power availabe (%).
D u a l
B u r n e r :
N o
One heat exchanger equipped with two burners: "Yes" or
"No".
DESCRIPTION "CASCINFO" Screen 11
Shows the number of boilers connected with the Cascade. The Master/Lead boiler is designated as 0.
Slave/Lag boilers will be designated 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B. When a “-“is used instead of a number, than
that boiler is either not connected, or in a lockout mode and not available for the Cascade. When an “x“ is
used instead of a number, than that boiler is connected, but in lockout mode.
When a “d” is used instead of a number, than that boiler is handling a DHW demand.
When the number is flashing, then that boiler is providing heat to the cascade. When the leading boiler is
changed according to the set priority change time, than that boiler’s address will be shown first in the row of
numbers.
Example 1: "3 4 5 - - - - - - 0 1 2"
There are six boilers present and nr. 3 has priority.
Example 2: "3 4 x - - - - - - d 1 2"
There are six boilers present and nr. 3 has priority. Boiler 0 is heating up an indirect DHW tank. Boiler 5 is
present, but in a lock-out.
Содержание S-CB 100
Страница 2: ......
Страница 4: ...4 ...
Страница 11: ...11 5 Frame groups Figure 4 Cascade frame groups for 1 2 3 4 5 and 6 boilers ...
Страница 34: ...34 notes ...
Страница 35: ... notes ...