23
Low Loss Header for
S
-CB
+
Boilers 150 – 180
5 or 6 Boilers
E
00
.000
.2
03
Fig. 8.3
E04.015.06
6
E04.008.03
4
DN 1
25 PN 6
(5")
330
1000
887
Ta
ble
4
.
Low velocity h
ea
ders
.
Low Loss Headers for S-CB
+
Boil
ers 60 – 120
4 Boilers:
E
00
.000
.1
66
Fig. 8.2
E04.015.06
6
E04.008.02
5
DN 8
0 PN6 (
3")
330
440
290
4 Boilers
E
00
.000
.1
67
Fig. 8.2
E04.015.06
6
E04.008.02
5
DN 1
00 PN6
(4")
330
439
355
***
**
We stan
dard
supply a manual vent
ing valve that can be mount
ed
on top of t
he low loss header t
o manually bleed the ai
r
from the low loss header. Instea
d
of the ½” ma
nual
bleed valve,
an automatic air vent can be installed, up to 1”max.
3 Boilers:
E
00
.000
.1
65
Fig. 8.2
E04.015.06
6
E04.008.02
5
DN 6
5 PN6 (
2½")
330
487
265
3 Boilers
E
00
.000
.1
66
Fig. 8.2
E04.015.06
6
E04.008.02
5
DN 8
0 PN6 (
3")
330
440
290
2 Boilers:
E
00
.000
.1
64
Fig. 8.1
E04.015.06
6
E04.008.02
5
R 1½"
330
436
190
2 Boilers
E
00
.000
.1
65
Fig. 8.2
E04.015.06
6
E04.008.02
5
DN 6
5 PN6 (
2½")
330
487
265
Head
er Gro
u
p
D
raw
ing
Venting val
ve
½"
1
Drai
n val
ve ½
"
D
H1 (boil
er-si
de)
H2 (in
stallati
on-side
)
L
Head
er Gro
u
p
D
raw
ing
Venting val
ve
½"
1
Drai
n val
ve ½
"
D
H
1 (
bo
iler
s
ide
)
H2 (installation side)
L
Содержание S-CB 100
Страница 2: ......
Страница 4: ...4 ...
Страница 11: ...11 5 Frame groups Figure 4 Cascade frame groups for 1 2 3 4 5 and 6 boilers ...
Страница 34: ...34 notes ...
Страница 35: ... notes ...