![Strebel Biotec 25 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/strebel/biotec-25/biotec-25_instruction-booklet_1384099005.webp)
5
INDEX
Possible Injury
Text showing this symbol give safety infor-
mation where applicable
Possible hand injuries
Working on parts marked with this symbol
can cause hand injuries. Wear Gloves.
Fire hazard
Text passages with this symbol give infor-
mation about fire hazards.
Additional information or advice
Adhere to local and national regulations
concerning positioning, installation, oper-
ation and disposal of the boiler.
Danger of frost
Frost forming in the system pipes during
cold weather can cause severe damages.
Text passages with this symbol contain
information relating to frost prevention.
Signs and symbols
Risk of electric shock
Sections marked with this symbol are only to be
carried out by an electrician. Text showing this sym-
bol give information about electrical matters.
Surfaces with high temperatures
Touching hot surfaces can cause burns. Surfaces
marked with this symbol may only be touched
when the system is fully cooled down. Text pas-
sages with this symbol hold information relating
to hot boiler parts.
DANGER
Safety information……………………………………………………………………...………..……………………………...……………...6
Technical data……….....................................................................................................................................7
Technical information, Service Clearances……………………..………...…………………....……………………………..…....8
Construction and function.............................................................. ........................................................... 9
Hydraulic Schemes……………............................................................................................................10,11 &12
Boiler features............................................................................................................................................13
Installation, Flue, Electrical……………………………………………………………………………………..……….….….14,15 & 16
Electrical &Connections……………………………………..…………………………………………………………………….…...16 &17
Commissioning.,………………………................................................................................................................18
Thermal valve………………………………………………………………………………………………………………………………….……18
Operational phases………………………………………………....…………………………....…………………………………………....19
Boiler controller............................................................................................................................20, 21 & 22
Control parameters ……………….....................................................................................................23, 24 & 25
Maintenance………………………………………………………………………………………………………………………………………….26
Possible faults………………………………............................................................................................................ 27
Fuel………………………………………………....…………………………....….......................................................................28
Relocating and boiler disposal.................................................................................................................... 29
Guarantee ...................................................................................................................... ............................29
SUPPLEMENTARY OPERATING INSTRUCTIONS FOR THE UK MARKET………………………..30
Clean Air Act Stipulation.………………………………………………………………………………………….4
Hetas Stipulation……………………………….………………………………………………….……………….
3
Содержание Biotec 25
Страница 1: ...INSTRUCTION BOOKLET BIOTEC 25 AND BIOTEC 40 Version BIOTECHTS122013 ...
Страница 2: ...2 ...