Lisa Compact
42
o
A task to update the schedule itself
9.2
Example Store-and-Forward task schedule
The following task schedule gives an idea of how Store-and-Forward can be implemented with the Task
Scheduler. Note that this is a rather basic example. In practice the task schedule probably contains
more sophisticated planning of playlists over time. More information on the Task Scheduler can be
found in
On Sunday Nov 1st 2015 at 21:00 in the evening, the Lisa updates its schedule.
This task is repeated daily, to update the schedule daily.
On Sunday Nov 1st 2015 at 23:00 in the evening, the Lisa performs a "Content update"
task. The content update file is downloaded and processed (see
).
This task is repeated daily, to be able to update the contents on the card daily.
On Monday Nov 2nd at 09:00 (shop opening time) the Lisa starts playing playlist 1.pls.
This playlist will be played every day, as the task is daily repeating.
Содержание Lisa Compact
Страница 1: ...Lisa Compact Updated on 6 23 2020 for software version 1 44 User Manual ...
Страница 108: ... 2020 Streamit B V ...