Index-1
Index
Index-
A
AC power service requirements, 2-2
ASN
Network Management Card EX, 2-10
PowerChute Network Shutdown, 2-10
qualified Symmetra models, 2-9
AS/NZS 3112-1993 connector, B-10
ASN, site planning, 1-3, 3-3, 4-8
B
BS connector
C
cabinets
configuration planning, 5-1, 5-5
cables
CEE connector
checklist for site planning, 1-2
circuit, electrical
communications cables
SAA/3/15 AS/NZS 3112-1993, B-10
CPP
current requirements, from PDU, 5-2
See
CAC
D
E
electrical
environmental requirements
maximum rate of temperature change, A-5
Ethernet
F
fault-tolerant systems, site planning, 1-3
Fibre Channel
Содержание ftServer 2600
Страница 1: ...Stratus Technologies R638 02 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 44: ...Grounding Requirements 2 16 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 48: ...Planning for Cables 3 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 64: ...Example of PDU Usage Calculation 5 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 70: ...Monitor Requirements 6 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 80: ...AAP87600 PDU Specifications A 10 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 98: ...Index Index 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...