Communications Line Planning
4-1
Chapter 4
Communications Line Planning
4-
Make sure that you plan the locations of your ftServer system and its external
components so that all communications and data cables will reach their connection
points.
This chapter contains the following sections:
“External SAS Connections” on page 4-2
“Fibre Channel Connections” on page 4-2
“iSCSI Connections (VMware Systems)” on page 4-7
“Telephone Line Connections” on page 4-8
“Site Planning for Systems in an ftGateway Group” on page 4-9
N O T E S
1. Software upgrade services are available from
. For a list of available services,
see
http://www.stratus.com/services/ps/offerings.htm.
2. If you have a unique network requirement, contact
. For a list of available
services, see
http://www.stratus.com/services/ps/offerings.htm.
3. See the
Stratus ftServer Systems: PCI Adapter
Guide
(R461) for more information about the
adapters Stratus supplies for your ftServer system.
Содержание ftServer 2600
Страница 1: ...Stratus Technologies R638 02 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 44: ...Grounding Requirements 2 16 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 48: ...Planning for Cables 3 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 64: ...Example of PDU Usage Calculation 5 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 70: ...Monitor Requirements 6 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 80: ...AAP87600 PDU Specifications A 10 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 98: ...Index Index 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...