Telephone Line Connections
4-8
Stratus ftServer 2600, 4500, and 6300 Systems: Site Planning Guide (R638)
Telephone Line Connections
The system requires up to two telephone cables, and related connection points:
One telephone line for use when calling for service
One analog telephone line to connect the ASN modem, if used, to a telephone
connection point
A 7-ft (2.13m) telephone cable (minimum 26 AWG phone cord) is shipped with the
modem assembly.
2
N O T E
A dedicated phone line provides the most reliable service
for ASN connections. ASN calls routed through a PBX
might be slow due to the load on the PBX, or might not
complete successfully because the calls can become
disconnected. If you must use a PBX, do not route the
telephone extension through a switchboard; instead,
provide a direct-dial analog number.
Always use telephone cable that is 26 AWG or greater and is UL approved.
If no modem is installed, a second telephone line is not necessary. A modem is not
necessary in the following situations:
If your system will connect to a network with Internet access, you may choose to
use the Internet to send alarms to the ASN and allow the CAC or your authorized
Stratus service representative to connect to your system over the Internet for
troubleshooting.
If you implement ftGateway groups, only one system in the group requires a
“Site Planning for Systems in an ftGateway Group”
for more
information.
Telephone Line Connections in Australia and New Zealand
The telephone used when calling for service shall comply with the following local
regulatory requirements:
Australia: The telephone shall have an A-tick label
New Zealand: The telephone shall have a Telepermit
2
The telephone cable is not shipped with orders destined for the Republic of
Korea.
Содержание ftServer 2600
Страница 1: ...Stratus Technologies R638 02 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 44: ...Grounding Requirements 2 16 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 48: ...Planning for Cables 3 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 64: ...Example of PDU Usage Calculation 5 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 70: ...Monitor Requirements 6 6 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 80: ...AAP87600 PDU Specifications A 10 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...
Страница 98: ...Index Index 4 Stratus ftServer 2600 4500 and 6300 Systems Site Planning Guide R638...