GATE ASSEMBLY

SLAT INSTALLATION

Screw the  bottom Receiving Rail Caps into the pre-
drilled Gate Receiving Rails using 8g x 11/5” (30mm) 
countersunk screws.
Insert a Reinforced Slat and screw it in through the pre-drilled 
holes using an 8g x 11/5” (30mm) countersunk screw in either 
end (Figure 3.0). Insert Spacers into each Receiving Rail.

Insert a Plain Slat into the Receiving Rail and gently tap it 
down to ensure a proper fit. Continue to insert Spacers and 
Plain Slats until the next pre-drilled holes in the Receiving 
Rails are reached (Figure 3.1).
Insert a Reinforced Slat and screw it in using two 8g x 11/5” 
(30mm) countersunk screws in each end of the slat.
Continue inserting spacers and slats until the top of the 
rail is reached.
Screw the Receiving Rail Caps into the top of the rails using 
two 8g x 11/5” (30mm) countersunk screws.

Reinforced Slat

8g x 1

1

5

” (30mm)

Countersunk
Screw

8g x 1

1

5

” (30mm)

Countersunk

Screw

Pre-Drilled

Holes

FIGURE 3.0

Reinforced Slats

Plain Slats

Pre-drilled
Holes

Receiving Rail Cap

FIGURE 3.1

GATE INSTALLATION

HINGE INSTALLATION

Measure and mark the required locations of the gate 
hinges as per the hinge manufacturer’s instructions. Rail 
Packers are used to provide a square mounting point on 
the Gate Receiving Rail.

Position the hinges on the Rail Packer and mark the locations 
of the holes. Pre-drill the Rail Packers using a 1/4”  (6mm) 
drill bit (Figure 4.0). Screw the hinges into position through 
the Rail Packer into the Gate Receiving Rail using 12g x 11/2” 
(39mm) hex head screws.

Measure and mark the position of the top gate hinge on 
the post to ensure the gate is level and square. Pre-drill the 
top screw hole into the post. Lift the gate into position and 
screw through the top hinge and attach the gate to the post.

Screw the bottom hinge into position and ensure the gate is 

level before screwing off all other hinges.

LATCH INSTALLATION

Measure and mark the required locations of the gate latch 
as per the latch manufacturer’s instructions, using the Rail 
Packer on the Gate Receiving Rail as a square mounting 
surface (Figure 4.0). Pre-drill the holes for the latch with 
a 1/4” (6mm) drill bit using the latch as a template. Secure 
the latch and Rail Packer to the gate frame with 12g x 11/2” 
(39mm) hex head self drilling screws through both the 

latch and the Rail Packer.

Rail Packer

Receiving Rail

Pre-drill Holes
(using hinge or 
latch as template)

FIGURE 4.0

Содержание Fence Sanctuary Ezi-Slat Fencing

Страница 1: ...Fence Solution Design fence loading determined in accordance with ASCE SEI 7 10 Minimum Design Loads for Buildings and other structures Non Engineered Panels Suitability of the slat supporting struct...

Страница 2: ...lat Plain Receiving Rail Optional components 12g x 3 75mm Pan Head Screw 10g x 3 4 20mm Wafer Head Self Drilling Screw 12g x 11 2 39mm Hex Head Self Drilling Screw 10g x 5 8 16mm Hex Head Self Drillin...

Страница 3: ...PANEL COMPONENT DIAGRAM 4 5 3 2 1 1 2 3 1 8g x 11 5 30mm COUNTERSUNK SCREWS 2 RECEIVING RAIL CAPS 3 RECEIVING RAIL 4 SPACER 5 SLAT...

Страница 4: ...fencing which is located closer than 3000 feet from these environments increased inspection and maintenance is required refer to the Stratco Product Maintenance Severe Environment Considerations broch...

Страница 5: ...ped to direct water away from the base of posts and steel contact with moisture retaining material such as soil paving sand and garden debris is to be avoided POST SIZE GRADE C350 MINIMUM FOOTING SIZE...

Страница 6: ...es between posts are correct STEEL SPIGOT INTO CONCRETE A 11 2 x11 2 x1 6 40x40x4 0mm SHS steel spigot can be installed into concrete Figure 1 2 The spigot must protrude from the concrete a minimum of...

Страница 7: ...ing two 8g x 11 5 30mm countersunk screws Figure 2 1 The cap may need to be knocked in using a rubber mallet Use a low torque setting on the drill to avoid snapping the screws Post Base Plate 4x 12g x...

Страница 8: ...into the receiving rail Figure 2 4 Continue to insert slats followed by spacers until the slats reach the top of the receiving rail Figure 2 5 POST CAPPING Gently tap in the Post Cap and Rail Cap usi...

Страница 9: ...ons of the gate hinges as per the hinge manufacturer s instructions Rail Packers are used to provide a square mounting point on the Gate Receiving Rail Position the hinges on the Rail Packer and mark...

Страница 10: ...ts that may reduce the life of the product Stratco steel and aluminum products that are regularly washed by rain require minimal maintenance No Stratco steel or aluminum structure or materials are rec...

Отзывы: