STRATCO EZI-SLAT FENCING INSTALLATION GUIDE
FIX RECEIVING RAIL TO POST
Screw the receiving rail onto the post using 10g x 4/5” (20mm)
wafer head screws through the pre-drilled holes (Figure 2.2).
SLAT INSTALLATION
Insert the first slat into the rail at an angle and tap both ends
down to the bottom rail cap (Figure 2.3). A rubber mallet
may be required to ensure a proper fit.
SPACING SLATS
Slide one spacer into the receiving rail (Figure 2.4).
Continue to insert slats followed by spacers until the slats
reach the top of the receiving rail (Figure 2.5).
POST CAPPING
Gently tap in the Post Cap and Rail Cap using a rubber mallet.
Screw the Rail Cap using two 8g x 11/5” (30mm) countersunk
screws (Figure 2.6). Alternatively, use SHS post capping as required.
*SHS post used for engineered fence solution.
Receiving Rail
Receiving Rail
FIGURE 2.3
FIGURE 2.5
Spacer
Receiving Rail
FIGURE 2.4
Rail Cap
Two 8g x 1
1
⁄
5
” (30mm)
Countersunk Screws
Slat
Post Cap
FIGURE 2.6
10g x
4
⁄
5
” (20mm)
Wafer Head
Screw
Receiving Rail
Post*
FIGURE 2.2