HE200 - Installation and Operation Manual
53
9.
A rain cap must be installed on top of the chimney. Failure to install a rain cap may cause corrosion
problems.
10.
Cut and frame square holes in all floors, ceilings, and roof that the chimney will go through to provide a
2" (50 mm) minimum clearance between the chimney and any combustible materials. Do not fill this 2
space with insulation or any other combustible material.
11.
Portions of the chimney which may extend through accessible spaces must be enclosed to avoid contact
with combustible materials or damage the chimney.
Содержание VB00003
Страница 10: ...10 HE200 Installation and Operation Manual 6 142mm FORCED AIR DISTRIBUTION KIT 3...
Страница 36: ...36 HE200 Installation and Operation Manual...
Страница 56: ...56 HE200 Installation and Operation Manual Direct installation Exterior offset installation...
Страница 89: ...HE200 Installation and Operation Manual 89 APPENDIX 7 EXPLODED DIAGRAM AND PARTS LIST...