Insert Filling Chamber Insert
approx. 1 mm
Make sure that the Filling Chamber
Disc sits properly in the Filling Cham-
ber. It must touch the top edge of the
Filling Chamber Cylinder made of
stainless steel.
Take care that the Screens
are not obstructed with plant
material. To guarantee opti-
mal results, we recommend to clean
the Screens after each vaporization
cycle with the enclosed Cleaning
Brush.
Put the Filling Chamber on the hot air
outlet of the Hot Air Generator. Switch
on the air pump. To do so, press the
green button/switch labeled “AIR”.
The Filling Chamber as well as the
vaporization material must be pre-
heated for a couple of seconds before
the aromas and fragrances will start to
vaporize.
10.
SOLID VALVE
Fill Filling Chamber
max. 10 mm
min. 1 mm
10.1. Application and Operation
The Balloon Material must be
kept out of the reach of chil-
dren as it is a potential source
of danger. As an alternative to the
VOL-
CANO
Balloon, only use heat-resis-
tant, food safe and odor-free oven
tubes and oven bags.
Filling the Filling Chamber
Remove the entire Filling Chamber In-
sert and fill the Chamber with the de-
sired amount of ground plant material.
Fit in the Filling Chamber Insert and
use the pin to lower the Screen Unit so
that the content of the Filling Chamber
is loosely fixed between the Screens.
10.
SOLID VALVE
approx. 5 sec
Stretch Valve
Balloon tight
Preheat plant material for a few seconds
Before putting the Valve Bal-
loon on the Filling Chamber,
stretch it so that it extends ver-
tically from the Hot Air Generator when
it is filled.
32
33