24
Installation
Air/Flue gas system
Installation Instructions - twin pipe -
Installation
)LWWLQJWKHÀXHV\VWHPWRWKHDSSOLDQ
-
ce must be carried out by a compe-
tent person in accordance with these
installation instructions
General
t
Store material inside.
t
Check the components on possi-
ble damages.
t
,QVWDOODIWHUQDWLRQDOUHJXODWLRQ
Fill out chimney label (when supplied)
and place it near boiler adaptor.
t
Pipes must be installed free of
tension.
t
3D\DWWHQWLRQWRWKHÀXHGLUHFWLRQ
The sockets must be pointing to
the terminal.
$VVHPEO\ÀXHJDVV\VWHP
Starting to assemble the pipes from
the boiler.
Assemble the pipes by turning and
pushing them till the bottom of the
joint
.
127('RQ¶WXVHVRDSRLOOXEULFDQW
Use only water as lubricant.
Before pipe exensions:
When using bends, the maximum
SHUPLVVLEOHOHQJWKRIÀXHJDVV\VWHP
can be deducted from the table on
pag.21.
Important
,QVWDOORQO\LQVLGHEXLOGLQJVRQXQÀD
-
mable wall
Cleaning
Outside can be cleaned with a wet
towel or with some detergent.
L
>
500 mm
L
>
250 mm
L
>
250
mm
L > 250 mm
L
>
250 mm
or
or
3°
,QVWDOOWHQVLRQIUHH
A
B
*F8=;8=4L
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
*F8=;8=4L
*F8=;8=4L
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
*F8=;8=4L
<0G
<<
<0G
<<
<0G
<<
R<<
R<<
U
*F8=;8=4L
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
*F8=;8=4L
<0G
<<
<0G
<<
<0G
<<
R<<
R<<
U
Ø < 100 mm
Cutting the pipe
t
Take out the inner tube by turning
it until it releases from its security
position
t
Cut the pipe
t
Take off the burrs from the cutting
edge to prevent cutting the seals
t
Re assembles the pipes
!
A
B
8-15 mm
*F8=;8=4L
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
#D4;8=:A>; , LFFF <D4;8=:6A>; 2><
*F8=;8=4L
Ø
130 mm
Max 1 Met
er
Max 1 Meter
Max
2
Meters
8-15 mm