25
GB
Installation
0DNHVXUHWKDWWKHÀXHWHUPLQDO
is not damaged.
'LIIHUHQWW\SHVRIÀXHWHUPLQDO
Synthetic tile
)ODWURRIÀDVKLQJ
8QLYHUVDOSLWFKHGURRIÀDVKLQJ
t
7DNLQJ WKH URR¿QJ LQWR DFFRXQW
determine the type of weather
FROODU V\QWKHWLF ¿OH RU XQLYHU
-
VDO SLWFKHG URRI ÀDVKLQJ IRU D
ÀDW URRI DQ DOXPLQLXP ÀDW URRI
ÀDVKLQJ
t
'HWHUPLQH ZKHUH WKH ÀXH
terminal will be positioned.
Installation
Air/Flue gas system
,QVWDOODWLRQRIYHUWLFDOÀXHWHUPLQDOV
1
2
3
With a tile roof use the universal
SLWFKHGURRIÀDVKLQJ
A.
0DNH D KROH IRU WKH ÀXH WHU
-
minal
from
the
outside.
Ensure that no saw dust or dust
gets into the boiler
B. Fit the weather collar and careful-
O\LQVHUWWKHÀXHWHUPLQDOWKURXJK
the roof from the outside.
Warning! Don’t turn the cap!
C.
3XWWKHÀXHWHUPLQDOLQWRDYHUWL
-
cal position using an air level.
,I GHVLUHG FRYHU SODWHV WR EH VXS
-
SOLHGVHSDUDWHO\FDQEH¿WWHG
D. Fix the supplied wall clamp round
WKHÀXHWHUPLQDODQG¿WLWWRWKH
roof construction, without tighten
the clamp yet.
Concentric
'HWHUPLQHWKHOHQJWKRIWKHÀXHSLSHV
and install these with the clamps in
accordance with the installation in-
structions in the previous pages.
Twin tube
Fit the gasket and the twin tube con-
nection. Make sure that the gasket
LVQRWGDPDJHG(QVXUHWKDWWKHÀXH
tube and the air inlet tube are not
H[FKDQJHGWKHÀXHWXEHLVWKHSLSH
LQWKHFHQWUHEHORZWKHÀXHWHUPLQDO
t
Secure the roof wall clamp and
check that all steps have been
carried out correctly
Warnings
,I LQVWDOOHG QHDU D OLJKW LQVHFWV PD\
À\ LQWR WKH RSHQLQJ 7HOO WKH KRPH
owner to clean the opening regularly.
Ensure while installation work is
being carried out that no debris such
DVVZDUI¿OLQJVRUIUDJPHQWVRIPRU
-
tar are allowed to remain in the air/
ÀXHGXFW
A
B
C
D