SECTION 2
INSTALLATION INSTRUCTIONS
2.1 SAFETY PRECAUTIONS
Do not attempt to operate the machine until the safety
precautions and operating instructions in this manual are
read completely and are thoroughly understood.
Take notice of all warning labels on the machine. The
labels have been put there to help maintain a safe working
environment. The labels have been designed to withstand
washing and cleaning. All labels must remain legible for
the life of the machine. Labels should be checked periodi-
cally to be sure they can be recognized as warning labels.
If danger, warning or caution labels are needed, indicate
the part number, type of label, location of label, and
quantity required along with your address and mail to:
STOELTING
ATTENTION: Customer Service
502 Hwy. 67
Kiel, Wisconsin 53042
2.2 SHIPMENT AND TRANSIT
The machine has been assembled, operated and in-
spected at the factory. Upon arrival at the final destination,
the entire machine must be checked for any damage
which may have occurred during transit.
With the method of packaging used, the machine should
arrive in excellent condition. THE CARRIER IS RESPON-
SIBLE FOR ALL DAMAGE IN TRANSIT, WHETHER
VISIBLE OR CONCEALED. Do not pay the freight bill until
the machine has been checked for damage. Have the
carrier note any visible damage on the freight bill. If
concealed damage and/or shortage is found later, advise
the carrier within 10 days and request inspection. The
customer must place claim for damages and/or shortages
in shipment with the carrier. Stoelting cannot make any
claims against the carrier.
2.3 MACHINE INSTALLATION
Installation of the machine involves moving the machine
close to its permanent location, removing all crating,
setting in place, assembling parts, and cleaning.
A.
Uncrate the machine.
B.
Determine the location of the machine. The location
must be able to hold 350 lbs.
C.
Accurate leveling is necessary for correct drainage
of machine barrel and to insure correct overrun.
Place a bubble level on top of the machine at each
corner to check for level condition. If adjustment
is necessary, level the machine by turning the
bottom part of each leg in or out.
D.
The F112-LJ has a base gasket that must be
installed. Separate the gasket and install it with the
seam to the back. Make sure the angled side of the
gasket is facing up.
E.
Correct ventilation is required. The E112-LJ requires
3” clearance on both sides. If the machine is placed
side-by-side next to other equipment, there needs
to be at lease 4” clearance at the back of the
machine. The air-cooled F112-LJ requires 6”
clearance on both sides for proper air flow.
F.
Connect the drip tray bracket by loosening the two
screws at the front of the machine. Install the
bracket so that it rests on the nylon washer
between the two metal washers. Tighten the screws.
G.
Place the CLEAN-ON-OFF switch in the OFF
position.
CAUTION
Failure to provide adequate ventilation will void war-
ranty.
Figure 2-3 Drip Tray Bracket
Figure 2-2 Space and Ventilation Requirements
Содержание E112-LJ
Страница 1: ...Model E112 LJ F112 LJ OPERATORS MANUAL Manual No 513643 Feb 2010...
Страница 2: ......
Страница 6: ......
Страница 8: ...2 Figure 1 2 Specifications E112 F112 1 2 SPECIFICATIONS...
Страница 10: ...4...
Страница 28: ...22...