© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
State: 15.06.2016 · S. 2
Mounting instructions for digger „tollo“
Item-No. 51 1100 402
Diagram 2: Side view with dimension details „tollo“
1. Select the play equipment location in consideration of the required safety
area (see Diagram 3: Ø 5500 mm).
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
Regarding to DIN 1176 - 4.2.8.2.5, impact absorbing surfaces have to be put
under the whole impact area of every equipment with an enforced movement.
3. Carry out excavation work for the foundation anchor as shown in Diagram 2.
After excavation, compress the foundation floor.
Note:
The play equipment is built in on the play level.
4. Set up the concrete foundation acc. to the dimensions (LxWxH 400 x 400 x
350mm) indicated with central, horizontal reinforcement.
5. During the setting period of 10 -14 days - depending on weather conditions
and foundation size - do not allow to use the equipment.
Reinforcement plan:
Concrete foundation with rein-
forcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class B25
450
400
350
Sand
Sand
Beton
Concrete
Füllmaterial
Filling
Erde
Gound
Rev.:
Projekt:
Sandbagger tollo neu
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
29.02.2016
Abmaße:
Fertigung:
Behnke
x
Gewicht:
Fundamentplan
0050A-00-00
450
400
350
Sand
Sand
Beton
Concrete
Füllmaterial
Filling
Erde
Gound
Rev.:
Projekt:
Sandbagger tollo neu
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
29.02.2016
Abmaße:
Fertigung:
Behnke
x
Gewicht:
Fundamentplan
0050A-00-00