background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Mounting instructions for swing „patis 3“ robinia 

Item-No. 51 2013 601

State: 10.09.2020 p. 1

 

Diagram 1: Overall view of the play equipment 

swing bar

post

Содержание patis 3 robinia

Страница 1: ... 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for swing patis 3 robinia Item No 51 2013 601 State 10 09 2020 p 1 Diagram 1 Overall view of the play equipment swing bar post ...

Страница 2: ...ing period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation 6 Clean the foundation surface Screw the swing bar with the included clamps at the posts as shown in diagram 4 Reinforcement plan Concrete foundation with reinforcement Main foundation BSt 500S Stirrups Ø 8 mm lengthwise and cros...

Страница 3: ...rts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the fact that the components are made of stainless steel with no normal steel parts in contact Diagram 3 Top view Area of the minimum space Impact surface when using natural floors with a shock absorbing effect When using synthetic impact protection the impact area shortens in the direction of t...

Страница 4: ...ipment with wooden elements it cannot be ruled out that dry cracks may develop These natural changes of wood are dependent on climate con ditions as well as on the age and usage of the play equipment Longer dry periods may lead to more dry cracks This development however does not represent a quality defect Static properties of the equipment are not impaired See EN 1176 Bbl 1 2019 01 4 2 7 6 Dry cr...

Отзывы: