background image

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Mounting instructions for swing „patis 3“ robinia 

Item-No. 51 2013 601

State: 10.09.2020 p. 2

 

Play level

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3, 7800 x 5940mm). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundations as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The swing is installed at play level.  

Pay attention to items marked „play level“ at play equipment! 

4.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement. 

5.  After a setting period of 10-14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation. 

6.  Clean the foundation surface. Screw the swing bar with the included clamps 

at the posts as shown in diagram 4. 

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 25/30

1000

 6391 

500

ca. 400

1083

450

7248

 2675 

 1000 

 1000 

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

patis 3 Robinie

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:35

A3

Name

Name

Fundament

0512-00-00

Maßstab

Mattheis

14.03.17

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete

gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
ES

18.05.20

stoßdämpfender Boden

A

Datum

Änderung

Rev

Diagram 2: Foundation plan 

Содержание patis 3 robinia

Страница 1: ... 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for swing patis 3 robinia Item No 51 2013 601 State 10 09 2020 p 1 Diagram 1 Overall view of the play equipment swing bar post ...

Страница 2: ...ing period of 10 14 days depending on weather conditions and foundation size fill up and compress the holes between the foundation and the foundation hole with excavation 6 Clean the foundation surface Screw the swing bar with the included clamps at the posts as shown in diagram 4 Reinforcement plan Concrete foundation with reinforcement Main foundation BSt 500S Stirrups Ø 8 mm lengthwise and cros...

Страница 3: ...rts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the fact that the components are made of stainless steel with no normal steel parts in contact Diagram 3 Top view Area of the minimum space Impact surface when using natural floors with a shock absorbing effect When using synthetic impact protection the impact area shortens in the direction of t...

Страница 4: ...ipment with wooden elements it cannot be ruled out that dry cracks may develop These natural changes of wood are dependent on climate con ditions as well as on the age and usage of the play equipment Longer dry periods may lead to more dry cracks This development however does not represent a quality defect Static properties of the equipment are not impaired See EN 1176 Bbl 1 2019 01 4 2 7 6 Dry cr...

Отзывы:

Похожие инструкции для patis 3 robinia