CAUTION
Do not obstruct the ventilation. Allow the charger to
cool down for 10 minutes after charging is complete
before touching it. Do not use the charger out of the
truck.
Folding platform maintenance
The folding platform must be checked regular-
ly. The following operations must be carried
out at least every three months or every 500
hours.
–
Check that the folding platform operates
correctly
–
Clean and lubricate the articulated parts of
the platform
Maintenance
5
Chassis, bodywork and fittings
100
1152 801 15 17 EN - 02/2021 - 14
Содержание EXU-H-18
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 11: ...1 Introduction ...
Страница 20: ...Introduction 1 Disposing of components and batteries 10 1152 801 15 17 EN 02 2021 14 ...
Страница 21: ...2 Safety ...
Страница 31: ...3 Overviews ...
Страница 40: ...Overviews 3 Markings 30 1152 801 15 17 EN 02 2021 14 ...
Страница 41: ...4 Use ...
Страница 94: ...Use 4 Handling the truck in specific situations 84 1152 801 15 17 EN 02 2021 14 ...
Страница 95: ...5 Maintenance ...
Страница 102: ... Then remove the mounting bracket 4 Maintenance 5 Access to the technical compartment 92 1152 801 15 17 EN 02 2021 14 ...
Страница 126: ...Maintenance 5 Commissioning and storage 116 1152 801 15 17 EN 02 2021 14 ...
Страница 127: ...6 Technical specifications ...
Страница 128: ...EXU H datasheet Technical specifications 6 EXU H datasheet 118 1152 801 15 17 EN 02 2021 14 ...
Страница 136: ...Technical specifications 6 Technical datasheet EXU H 20S option 126 1152 801 15 17 EN 02 2021 14 ...
Страница 140: ......
Страница 141: ......
Страница 142: ...STILL GmbH 1152 801 15 17 EN 02 2021 14 ...