FS 510 C-M, FS 560 C-M
English
47
Spacer
Check
X
Replace
2)
X
X
Exhaust port
Decoke after first 139 hours of opera
-
tion, then every 150 hours of operation
X
All accessible screws and nuts (not adjust
-
ing screws)
3)
Retighten
X
Antivibration elements
Check
4)
X
X
Replace
2)
X
Cutting attachment
Visual inspection
X
X
Replace
X
Check tightness
X
X
Metal cutting attachment
Sharpen
X
X
Safety labels
Replace
X
1)
Only if there is a noticeable loss of engine power
2)
STIHL recommends that this work be done by a STIHL servicing dealer
3)
Tighten down the muffler mounting screws firmly after first 10 to 20 hours of operation.
4)
see chapter "Inspection and Maintenance by Dealer", section "Antvibration elements"
The following intervals apply to normal operating conditions only. If your daily work
-
ing time is longer or operating conditions are difficult (very dusty work area, etc.),
shorten the specified intervals accordingly.
be
for
e starting
work
af
te
r fin
ishing
work
or
dail
y
af
te
r each
ref
ueli
ng
st
op
weekly
mon
thl
y
ever
y
12
mont
hs
if p
robl
em
if d
amage
d
if r
equi
red
Содержание FS510 C-M
Страница 1: ... STIHL FS 510 C M 560 C M Instruction Manual Notice d emploi ...
Страница 2: ...G Instruction Manual 1 54 F Notice d emploi 55 114 ...
Страница 117: ...FS 510 C M FS 560 C M français 115 ...
Страница 118: ...FS 510 C M FS 560 C M français 116 ...
Страница 119: ......
Страница 120: ...www stihl com 04587728221A 0458 772 8221 A 0458 772 8221 A CDN G F ...