1 Concrete base
2 Impact sound insulation
3 Floating screed
4 Floor covering
5 Recess
9.4 Wall outlet
9.4.1 General
f
f
Always ensure there is enough space for the other supply
lines in the wall outlets (see chapter “Specification / Dimen-
sions and connections”).
f
f
Route the brine lines through separate wall outlets.
f
f
Provide thermal insulation on the brine lines in accordance
with applicable regulations.
9.4.2 Wall outlets above ground
f
f
Establish wall outlets in the building wall with a slight fall to
the outside (minimum inclination: 1 cm every 30 cm).
f
f
Insert the wall outlets with a slight fall.
f
f
Seal the space between the wall and wall outlet with mortar.
f
f
Route the brine lines through the wall outlets.
f
f
Seal the space between the brine line and wall outlet with a
suitable sealant (e.g. well foam). Ensure the brine lines are
centred in the wall outlets.
9.4.3 Wall outlets below ground
!
Material losses
f
f
Use waterproof wall outlets below the highest
groundwater level.
A
C
D
B
D
00000
82
87
0
1
2
1
3
3
4
1 Wall outlet
2 Brine line
3 Mortar
4 Sealant
f
f
Establish wall outlets in the building wall with a slight fall to
the outside (minimum inclination: 1 cm every 30 cm).
f
f
Insert the wall outlets with a slight fall.
f
f
Cut off the wall outlet from the top downwards at an angle to
the building wall.
f
f
Seal the space between the wall and wall outlet with mortar.
f
f
Route the brine lines through the wall outlets.
f
f
Seal the space between the brine line and wall outlet with a
suitable sealant (e.g. well foam). Ensure the brine lines are