8
S
TEP
4
–
Upright Post
Assembly
a. 2pcs
Thin
Nylock Nuts (M10xp1.5)(153)
have preassembled into the front of the
Main Frame (1)
as the following
drawing shows (they will not be tight, so that slotted bracket of the upright post will slide between the nut and the
frame).
b. Insert the
Upright Post (4)
into the
Main Frame (1)
and secure with 2pcs
Bolts, Hex Head (M10xp1.5x50mm)(143)
by using the
T-HEAD SOCKET WRENCH
as shown.
NOTE: Please do not fully tighten Bolts (143) or Nuts (153) until Step. 10 has been
COMPLETED.
“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
5
–
Console
Fixed Plate Assembly
NOTE:
4pcs
Lock
Washers
(M8)(111)
and 4pcs
Bolts,
Button
Head (M8×p1.25×12mm)(166)
are attached to the top of the
Upright Post (4).
a. Remove 4pcs
Lock
Washers (M8)(111)
and
4pcs
Bolts, Button
Head(M8×p1.25×12mm)
(166)
from the top of the
Upright
Post (4)
.
b. Attach the
Console Fixed
Plate (165)
to the top of the
Upright Post (4)
with secure
with 4pcs
Lock Washers
(M8)(111)
and 4pcs
Bolts(M8xp1.25x12mm)
(166)
.
S
TEP
6
–
Pivoting Arm
Linkage, Front
Linkage Cover & Rear
Rotation Cover
Assembly
NOTE:
2pcs
Bolts, Hex Head (M10×p1.5×70mm)(145)
, 2pcs
Nylon Nuts
(M10xp1.5)(154) and
8pcs
Bolts, Round Head (M5xp0.8x15mm)(125)
are attached to
the
Right Pivoting Arm Linkage (16)
as the left drawing shown.
a. Remove 2pcs
Bolts, Hex Head
(M10×p1.5×70mm)(145)
, 2pcs
Nylon Nuts
(M10xp1.5)(154)
and
8pcs Bolts, Round Head
(M5×p0.8×15mm)(125)
from the
Right Pivoting