42
04/24999499
Maintenance
If the equipment is used in smoke heat extraction systems (short SHE), it must be checked, serviced and, if necessary,
repaired at least once per year. This is also recommended for purely ventilation systems. Clean the equipment. Check
the tightness of
fi
xing and locking screws. Test the devices by a trial run according to the Chapter start up procedure and
trial run.
Defective equipment must be repaired in our plant. Only original spare parts are to be used. Check regularly that the
equipment is ready for service. To this purpose we recommend a service contract with the manufacturer or another
authorized specialist. All standard batteries provided with the SHE control panel require regular checks as part of the
maintenance programme and are to be replaced after the speci
fi
ed service life (4 years). Observe the legal requirements
when disposing of hazardous materials - e.g. batteries. Reset of the maintenance timer if activated. The operating
instructions of the connected components must be strictly observed!
Out of order
In order to put the SHE system out of order, the control panel must be disconnected from the mains and the battery fuse
has to be taken off. During the period out of operation the activated service timer stops and stores the last forwarded
data. As soon as the control panel system is once again connected to the mains the service timer continues to run as
usual.
Measures
UP-frame, accessory optional for TRZ plus DG
TRZ Plus DG
SMOKE VENT
SHE control panel TRZ Plus DG
119 mm
195
mm
142 mm
146 mm
80 mm
83 mm
238 mm
181 mm
268 mm
104 mm
2,8 mm
107 - 115 mm
324
mm
319
mm
296
mm