The Video Conference Screen is large and heavy and requires special
attention relating to shipping and transportation. Keep the following
information in mind when moving the crate from the truck to the final
mounting location.
The shipping crate needs to remain flat at all times.
The top of the crate needs to be kept up towards the sky.
Never rotate the shipping crate onto its side.
Never stand the crate on end.
Before removing the unit from the crate, review the installation instructions
and ensure that the site is prepared. To remove the unit from the shipping
crate:
1. Place the crate under the intended mounting location.
2. Remove crate lid.
3. Use appropriate methods to raise unit to mounting location.
Preferred methods are automatic winches or hydraulic lifts.
Video Conference Screen: Owner’s Manual
3
R
ECEIVING AND
R
EMOVAL FROM
S
HIPPING
C
RATE
Содержание VCS-1007
Страница 15: ...MAINTENANCE NOTES ...
Страница 16: ...www stewartfilm com 1 800 762 4999 Fax 310 326 6870 ...