STERO SD1 LOW TEMP DISHWASHER |
5
INSTALLATION
Figure 2
UNPACKING
Immediately after unpacking the dishwasher, check it for possible shipping damage. If this machine is found to
be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Prior to installation, verify that the electrical service agrees with the specifications on the machine data plate
which is located to the right of the control box.
LOCATION
Before finalizing machine location, make sure that consideration has been given for water supply, drain con-
nection, electrical conduit, tabling, chemical containers and supply lines, as well as adequate clearance for
opening the doors. A hood or vent may be required in order to meet local codes.
LEVELING
The dishwasher must be level before any connections are made. With the dishwasher in its operating location,
turn the threaded feet as required to level the machine front-to-back and side-to-side.
CONVERTING FROM STRAIGHT-THROUGH TO CORNER OPERATION
The SD1 is shipped from the factory for straight-through oper-
ation. To convert to corner operation, move the rack track and
splash guard as follows:
1. Remove the two screws and nuts that secure the front rack
track and splash guard (Figure 1) and remove the front rack
track and splash guard. Reassemble the front rack track and
splash guard by replacing the two screws and nuts in the
same mounting holes from which they were removed.
2. Remove the two screws and nuts at the outer edges of the
splash guard (Figure 2).
3. With the two screws and nuts removed in step 2, reattach the front rack track and splash guard to the
left side of the rack track assembly, using the mounting holes (Figure 3) provided.
Figure 3
Figure 1
SCREWS
FRONT RACK TRACK
AND SPLASH GUARD
SCREWS
MOUNTING HOLES