Sterling TUBULAR GAS FIRED PROPELLER UNIT HEATERS Скачать руководство пользователя страница 1

(S) TBIM-5R

J30-05375B

INSTALLATION INSTRUCTIONS AND PARTS LIST

TUBULAR GAS FIRED PROPELLER UNIT HEATERS

Model No.

Serial No.

ATTENTION: READ THIS MANUAL AND ALL LABELS ATTACHED TO THE UNIT CAREFULLY BEFORE

ATTEMPTING TO INSTALL, OPERATE OR SERVICE THESE UNITS! CHECK UNIT DATA PLATE FOR TYPE OF GAS

AND ELECTRICAL SPECIFICATIONS AND MAKE CERTAIN THAT THESE AGREE WITH THOSE AT THE POINT OF

INSTALLATION.  RECORD THE UNIT MODEL AND SERIAL No.(s) IN THE SPACE PROVIDED.  RETAIN FOR FUTURE

REFERENCE.

FOR YOUR SAFETY

The use and storage of gasoline or other flammable vapors and liquids in open containers in
the vicinity of this appliance is hazardous.

FOR YOUR SAFETY

If you smell gas:
1. Open windows.
2. Don't touch electrical switches.
3. Extinguish any open flame.
4. Immediately contact your gas supplier.

APPROVED FOR USE IN CALIFORNIA

 Install, operate, and maintain unit in accordance with the manufacturer's

instructions to avoid exposure to fuel substances, or substances from incomplete
combustion, which can cause death or serious illness.  The state of California has
determined that these substances may cause cancer, birth defects, or other
reproductive harm.

INSTALLER'S RESPONSIBILITY

Installer Please Note:

 This equipment has been test fired and inspected. It has been

shipped free from defects from our factory. However, shipment and installation
problems such as loose wires, leaks, or loose fasteners may occur. 

It is the installer's

responsibility to inspect and correct any problem that may be found.

RECEIVING INSTRUCTIONS

Inspect shipment immediately when
received to determine if any damage
has occurred to the unit during
shipment. After the unit has been
uncrated, check for any visible
damage to the unit. If any damage is
found, the consignee should sign
the bill of lading indicating such
damage and immediately file claim
for damage with the transportation
company.

www.sterlinghvac.com

HVAC PRODUCTS

260 NORTH ELM ST., WESTFIELD, MA 01085

TEL: (413) 564-5540     FAX: (413) 562-5311

 Improper installation, adjustment, alteration, service, or maintenance can

cause property damage, injury, or death. Read the installation, operating, and
maintenance instruction thoroughly before installing or servicing this equipment.

MODELS: TF-100, 125, 150, 175,

200, 250, 300, 350, 400

07/03

Please utilize this toll free number to contact your local
representative 800-490-2290.

Содержание TUBULAR GAS FIRED PROPELLER UNIT HEATERS

Страница 1: ...that these substances may cause cancer birth defects or other reproductive harm INSTALLER S RESPONSIBILITY Installer Please Note This equipment has been test fired and inspected It has been shipped f...

Страница 2: ...6 Proper Clearances 5 6 Suspension of Units 5 6 Gas Piping 7 8 ELECTRICAL CONNECTIONS 9 10 11 12 13 VENTING 14 15 16 17 18 OPERATION Explanation of Controls and Operation 19 Main Burner Orifice Sched...

Страница 3: ...rocedures listed on Gas Equipment Start Up Sheet located in this manual Use only the fuel for which the heater is designed see rating plate Using LP gas in a heater that requires natural gas or vice v...

Страница 4: ...8 5 8 48 5 8 473 473 473 778 778 778 1235 1235 1235 F Discharge Opening Width 18 3 4 18 3 4 18 3 4 30 3 4 30 3 4 30 3 4 48 3 4 48 3 4 48 3 4 476 476 476 781 781 781 1238 1238 1238 G Depth to CL Flue 4...

Страница 5: ...epair Garages In Canada installation must be in accordance with current CGA B149 Installation Codes for Gas Burning Appliances and Equipment AIR DISTRIBUTION Direct air towards areas of maximum heat l...

Страница 6: ...acent materials Make certain that the lifting methods used to lift the heater and the method of suspension used in the field installation of the heater are capable of uniformly supporting the weight o...

Страница 7: ...ity Gas Nominal Iron Internal Length of Pipe Feet meters Pipe Size Dia 10 20 30 40 50 60 70 80 90 100 125 150 175 200 in in 3 0 6 1 9 1 12 2 15 2 18 3 21 3 24 4 27 4 30 5 38 1 45 7 53 3 61 0 1 2 0 622...

Страница 8: ...test edition National Fuel Gas Code in Canada according to CGA B149 See Tables 1 3 for correct gas piping size If gas pressure is excessive on natural gas applications install a pressure regulating va...

Страница 9: ...n cause severe personal injury or death Standard units are shipped for use on 115 volt 60 hertz single phase electric power The motor name plate and electrical rating of the transformer should be chec...

Страница 10: ...Units Equipped with Hot Surface Pilot Single Stage 100 400 Unit Sizes with Natural Gas and Propane LP Gas Figure 5d Primary HWSV9540 SV9640 Hot Surface Ignition Gas Controls Figure 5e Alternate HWSV95...

Страница 11: ...11 ELECTRICAL CONNECTIONS continued Figure 5f Tubular Units Equipped with S8600 Single Stage Ignition Optional for Tubular 100 400 Unit Sizes with Natural Gas and Propane LP Gas...

Страница 12: ...12 ELECTRICAL CONNECTIONS continued Figure 5g Tubular 100 400 Unit Sizes with Optional 2 Stage Ignition...

Страница 13: ...s in areas under negative pressure due to large exhaust fans or air conditioning When required a flue vent fan should be installed in accordance with the instructions included with the fan 10 Vent con...

Страница 14: ...hall terminate at least four feet 1 2m below four feet 1 2m horizontal from or one foot 0 3m above any door window or gravity vent air inlet into the building The vent terminal must be at least 12 inc...

Страница 15: ...l codes with current CGA B149 1 Installation Codes for Natural Gas Burning Appliances and Equipment or CGA B149 2 Installation Codes for Propane Gas Burning Appliances and Equipment 2 Any reference to...

Страница 16: ...16 Figure 8A Figure 8B VENTING continued...

Страница 17: ...17 VENTING continued Figure 9A Figure 9B...

Страница 18: ...wall thermostat supplied optionally is a temperature sensitive switch which operates the vent system and the ignition system to control the temperature of the space being heated It must be mounted on...

Страница 19: ...unit heaters must be orificed to 90 of the normal altitude rating and be so marked in accordance with CSA certification Check the gas input rate as follows Refer to General Safety Information section...

Страница 20: ...ssure altitude of the unit installation and the technician s name and date on the label using a permanent marker Refer to Installation Instruction section on Adjustments Gas Input Rate for adjusting t...

Страница 21: ...ssure Refer to Operation Replace regulator section of combination gas valve or complete valve Check with local gas supplier for proper orifice size and replace Refer to Operation 1 Clean main burner p...

Страница 22: ...ration 3 Purge air from gas line 4 Follow lighting instruction label adjacent to gas valve 5 Remove pilot orifice Clean with compressed air or solvent Do not ream 6 Refer to Operation 7 Check thermoco...

Страница 23: ...cal Connections 2 Replace motor 3 Check for 24V across 1 and 3 terminals on fan relay If 24V is present jumper terminals numbered 2 and 4 If motor runs the relay is defective and must be replaced If 2...

Страница 24: ...will be free from defects in material or workmanship for 1 year from the date of shipment from the factory or one and one half 1 1 2 years from the date of manufacture whichever occurs first The Manuf...

Страница 25: ...the heat exchanger 5 Remove any dirt dust or other foreign matter from the burners using a wire brush and or compressed air Ensure that all parts are unobstructed Inspect and clean the pilot burner i...

Страница 26: ...FICATION OF PARTS PROPELLER UNIT HEATERS Figure 13 Heat Exchanger Assembly Figure 14 Electrical Control Panel Figure 11 Propeller Parts Figure 12 Component Parts D4430 Fan Guard Fan Blade Hardware Har...

Страница 27: ...er Assembly 300 400 Unit Sizes Shown HOW TO ORDER REPLACEMENT PARTS Please send the following information to your local representative if further assistance is needed contact the manufacturer s custom...

Страница 28: ...and all the controls on this equipment If not contact your wholesaler or rep DO NOT START this equipment unless you fully understand the controls GAS EQUIPMENT START UP GENERAL With power and gas off...

Отзывы: