Sterling GF-150 Скачать руководство пользователя страница 3

3

GENERAL SAFETY INFORMATION

 Failure to comply with the general 

safety information may result in extensive 
property damage, severe personal injury, or 
death.

 This product must be installed by 

a licensed plumber or gas fi tter when installed 
within the Commonwealth of Massachusetts.

Installation must be made in accordance with local 
codes, or in absence of local codes, with the latest 
edition of the ANSI Standard Z223.1 (N.F.P.A. No. 54) 
National Fuel Gas Code.

 All of the ANSI and NFPA 

Standards referred to in these installation instructions 
are those that were applicable at the time the design 
of this appliance was certified. The ANSI Standards 
are available from CSA Information Services, 1-800-
463-6727. The NFPA Standards are available from the 
National Fire Protection Association, Batterymarch Park, 
Quincy, MA  02269. These unit heaters are designed for 
use in airplane hangars when installed in accordance 
with ANSI/NFPA No. 409, and in public garages when 
installed in accordance with NFPA No. 88A and NFPA 
No.88B.

If installed in Canada, the installation must conform with 
local building codes, or in the absence of local building 
codes, with CGA-B149.1 “Installation Codes for Natural 
Gas Burning Appliances and Equipment” or CGA-B149.2 
“Installation Codes for Propane Gas Burning Appliances 
and Equipment.” These unit heaters have been designed 
and certifi ed to comply with CGA 2.6. Also see sections 
on installation in AIRCRAFT HANGARS and PUBLIC 
GARAGES.

 Do not alter the unit heater in any 

way or damage to the unit and/or severe personal 
injury or death may occur!

Disconnect all power and gas 

supplies before installing or servicing the heater.  
If the power disconnect is out of sight, lock 
it in the open position and tag it to prevent 
unexpected application of power. Failure to do 
so could result in fatal electric shock, or severe 
personal injury.

 Ensure that all power sources conform 

to the requirements of the unit heater, or damage to 
the unit will result!

Follow installation instructions CAREFULLY to avoid 
creating unsafe conditions. All wiring should be done 
and checked by a qualifi ed electrician, using copper wire 
only. All gas connections should be made and leak-tested 
by a suitably qualifi ed individual, per instructions in this 
manual. Also follow procedures listed on “Gas Equipment 
Start-Up Sheet” located in this manual.

Use only the fuel for which the heater is designed (see 
rating plate). Using LP gas in a heater that requires 
natural gas, or vice versa, will create risk of gas leaks, 
carbon monoxide poisoning, and explosion.

 Do not attempt to convert the 

heater for use with a fuel other than the one 
intended. Such conversion is dangerous, as it 
will create the risks previously listed.

Make certain that the power source conforms to the 
electrical requirements of the heater.

 Do not depend upon a thermostat 

or other switch as sole means of disconnecting 
power when installing or servicing heater. Always 
disconnect power at main circuit breaker as 
described above. Failure to do so could result in 
fatal electric shock.

Special attention must be given to any grounding 
information pertaining to this heater. To prevent the risk of 
electrocution, the heater must be securely and adequately 
grounded. This should be accomplished by connecting 
a ground conductor between the service panel and the 
heater. To ensure a proper ground, the grounding means 
must be tested by a qualifi ed electrician.

Do not insert fi ngers or foreign objects into heater or its 
air moving device. Do not block or tamper with the heater 
in any manner while in operation, or just after it has been 
turned off, as some parts may be hot enough to cause 
injury.

This heater is intended for general heating applications 
ONLY. It must NOT be used in potentially dangerous 
locations such as fl ammable, explosive, chemical-laden, 
or wet atmospheres.

Do not attach ductwork to this product or use it as a 
makeup air heater. Such usage voids the warranty and 
will create unsafe operation.

In cases in which property damage may result from 
malfunction of the heater, a back-up system or 
temperature sensitive alarm should be used.

 The open end of piping systems being 

purged shall not discharge into areas where there 
are sources of ignition or into confined spaces 
UNLESS precautions are taken as follows: (1) by 
ventilation of the space, (2) control of the purging 
rate, (3) elimination of all hazardous conditions. All 
precautions must be taken to perform this operation 
in a safe manner!

Unless otherwise specifi ed, the following conversions 
may be used for calculating SI unit measurements:
1 foot = 0.305 m 
1 inch = 25.4 mm 
1 gallon = 3.785 L 
1 pound = 0.453 kg
1 psig = 6.894 kPa
1 cubic foot = 0.028m

3

1000 BTU/cu. ft. = 37.5 MJ/m

3

1000 BTU per hour = 0.293 kW
1 inch water column = 0.249 kPa
1 litre/second = CFM x 0.472
1 meter/second = FPM ÷ 196.8

Содержание GF-150

Страница 1: ...en test fired and inspected It has been shipped free from defects from our factory However shipment and installation problems such as loose wires leaks or loose fasteners may occur It is the installer...

Страница 2: ...bustion Air 5 6 Proper Clearances 5 6 Suspension of Units 5 6 Gas Piping 7 8 ELECTRICAL CONNECTIONS 9 10 11 VENTING 12 13 14 15 16 OPERATION Explanation of Controls and Operation 17 Main Burner Orific...

Страница 3: ...t Start Up Sheet located in this manual Use only the fuel for which the heater is designed see rating plate Using LP gas in a heater that requires natural gas or vice versa will create risk of gas lea...

Страница 4: ...30 5 8 30 5 8 48 5 8 48 5 8 48 5 8 473 473 473 778 778 778 1235 1235 1235 F Discharge Opening Width 18 3 4 18 3 4 18 3 4 30 3 4 30 3 4 30 3 4 48 3 4 48 3 4 48 3 4 476 476 476 781 781 781 1238 1238 12...

Страница 5: ...st be equipped with an OSHA approved fan guard Refer to the latest edition of NFPA 88A Parking structures In Canada installation must be in accordance to the latest edition of CGA B149 Installation Co...

Страница 6: ...cent materials Make certain that the lifting methods used to lift the heater and the method of suspension used in the field installation of the heater are capable of uniformly supporting the weight of...

Страница 7: ...ity Gas Nominal Iron Internal Length of Pipe Feet meters Pipe Size Dia 10 20 30 40 50 60 70 80 90 100 125 150 175 200 in in 3 0 6 1 9 1 12 2 15 2 18 3 21 3 24 4 27 4 30 5 38 1 45 7 53 3 61 0 1 2 0 622...

Страница 8: ...Code in Canada according to CGA B149 See Tables 1 3 for correct gas piping size If gas pressure is excessive on natural gas applications install a pressure regulating valve in the line upstream from t...

Страница 9: ...re air Always refer to the thermostat instructions as well as our unit wiring diagram and wire accordingly Avoid mounting the thermostat in the following locations 1 Cold Areas Outside walls or areas...

Страница 10: ...10 ELECTRICAL CONNECTIONS continued Figure 5d Tubular Units Equipped with Natural Gas and Propane LP Gas...

Страница 11: ...11 ELECTRICAL CONNECTIONS continued Figure 5e Tubular Unit Sizes with Optional 2 Stage Ignition...

Страница 12: ...its in areas under negative pressure due to large exhaust fans or air conditioning When required a flue vent fan should be installed in accordance with the instructions included with the fan 10 Vent c...

Страница 13: ...et Adjacent public walkways 7 feet above grade The venting system for these appliances shall terminate at least 4 feet 1 2m below 4 feet 1 2m horizontal from or 1 foot 0 3m above any door window or gr...

Страница 14: ...odes or in the absence of local codes with current CGA B149 1 Installation Codes for Natural Gas Burning Appliances and Equipment or CGA B149 2 Installation Codes for Propane Gas Burning Appliances an...

Страница 15: ...15 Figure 8A Figure 8B VENTING continued...

Страница 16: ...16 VENTING continued Figure 9A Figure 9B...

Страница 17: ...e period ends the power venter motor is de energized 6 The fan operation is delayed 30 seconds once the thermostat is closed and continues operation for 30 seconds after the thermostat opens NOTICE Th...

Страница 18: ...unit heaters must be orificed to 90 of the normal altitude rating and be so marked in accordance with ETL certification Check the gas input rate as follows Refer to General Safety Information section...

Страница 19: ...ssure altitude of the unit installation and the technician s name and date on the label using a permanent marker Refer to Installation Instruction section on Adjustments Gas Input Rate for adjusting t...

Страница 20: ...t openings 3 Clean heat exchanger Refer to Installation 4 Determine cause and repair accordingly 1 Inspect all gas piping and repair 2 Check to ensure gas test ports are seated 3 Clean heat exchanger...

Страница 21: ...tat 1 Replace or tighten 2 Clean power ventor wheel 3 Realign power ventor wheel 1 Check and tighten wires on fan circuit 2 Test for 115v on terminal ACB Heat and L2 if voltage is present replace moto...

Страница 22: ...heat If not present and all checks are normal replace 1 Check power ventor circuit per wiring diagram 2 Check motor voltage and amp draw to motor name plate replace if motor found defective 3 Check f...

Страница 23: ...er 3 5 Amp fuse on circuit board 1 Common side of transformer grounded to chassis 2 Loose spark ignitor 1 Gas supply off or gas supply pressure too low 2 Flame sense rod contaminated or loose wire 3 G...

Страница 24: ...l safety devices supplied with your unit NOTICE The heater and vent system should be checked once a year by a qualified technician All Maintenance Service information should be recorded accordingly on...

Страница 25: ...ogenated hydrocarbons precipitated in the air d to any workmanship of the installer of the Product 3 This limited warranty is conditional upon a advising the installing contractor who in turn notify t...

Страница 26: ...ICATION OF PARTS PROPELLER UNIT HEATERS Figure 13 Heat Exchanger Assembly Figure 14 Electrical Control Panel Figure 11 Propeller Parts Figure 12 Component Parts D4430 Fan Guard Fan Blade Hardware Hard...

Страница 27: ...er Assembly 300 400 Unit Sizes Shown HOW TO ORDER REPLACEMENT PARTS Please send the following information to your local representative if further assistance is needed contact the manufacturer s custom...

Страница 28: ...n installed Do you understand all the controls on this equipment If not contact your wholesaler or rep DO NOT START this equipment unless you fully understand the controls GAS EQUIPMENT START UP GENER...

Отзывы: