Sterling GF-150 Скачать руководство пользователя страница 28

Customer  

____________________________________  

Job Name & Number  

_________________________

PRE-INSPECTION INFORMATION

With power and gas off.

Type of Equip:

 

 

Unit Heater 

   

Serial Number

 

_________________________  Model Number __________________________

Name Plate Voltage:

 

_____________ 

Name Plate Amperage:  _____________

Type of Gas:

   

Natural   

LP 

Tank Capacity _______ lbs. 

Rating: _  _____ BTU @ ____ °F

                                                                                                      _______ kg 

             _  _____ kw @   ____ °C

 

Are all panels, doors, vent caps in place?

 

Has the unit suffered any external damage?   

Damage  ______________________________

 

Does the gas piping and electric wiring appear to be installed in a professional manner?

 

Has the gas and electric been inspected by the local authority having jurisdiction?

 

Is the gas supply properly sized for the equipment?

 

Were the installation instructions followed when the equipment was installed?

 

Have all fi eld installed controls been installed?

 

Do you understand all the controls on this equipment?  

If not, contact your wholesaler or rep.

 

 

(DO NOT START this equipment unless you fully understand the controls.)

 

GAS  EQUIPMENT

START-UP

GENERAL

With power and gas off.

 

Make certain all packing has been removed.

  Tighten all electrical terminals and connections.

  Check damper linkages for tightness.

  Check all fans & blowers for free movement.

  Check all controls for proper settings.

              

Remarks: 

_____________________________________________

__________________________________________________
__________________________________________________

GAS HEATING

With power and gas on.

❐ 

Inlet gas pressure.  

____  in. W.C. or ____ kPa

 Burner ignition.

  Manifold gas pressure. ____  in. W.C. or ____ kPa

  Cycle on HIGH LIMIT.

  Cycle fi restat and/or freezestat.

  Check electronic modulation.  Set at: __________ 

  Cycle and check all other controls not listed.

  Check operation of remote panel.

  Entering air temp. _____ °F or ____ °C

  Discharge air temp.  (high fi re) ____ °F. or ____ °C

  External static pressure  _________ in. W.C.

  Cycle by thermostat or operating control.

Содержание GF-150

Страница 1: ...en test fired and inspected It has been shipped free from defects from our factory However shipment and installation problems such as loose wires leaks or loose fasteners may occur It is the installer...

Страница 2: ...bustion Air 5 6 Proper Clearances 5 6 Suspension of Units 5 6 Gas Piping 7 8 ELECTRICAL CONNECTIONS 9 10 11 VENTING 12 13 14 15 16 OPERATION Explanation of Controls and Operation 17 Main Burner Orific...

Страница 3: ...t Start Up Sheet located in this manual Use only the fuel for which the heater is designed see rating plate Using LP gas in a heater that requires natural gas or vice versa will create risk of gas lea...

Страница 4: ...30 5 8 30 5 8 48 5 8 48 5 8 48 5 8 473 473 473 778 778 778 1235 1235 1235 F Discharge Opening Width 18 3 4 18 3 4 18 3 4 30 3 4 30 3 4 30 3 4 48 3 4 48 3 4 48 3 4 476 476 476 781 781 781 1238 1238 12...

Страница 5: ...st be equipped with an OSHA approved fan guard Refer to the latest edition of NFPA 88A Parking structures In Canada installation must be in accordance to the latest edition of CGA B149 Installation Co...

Страница 6: ...cent materials Make certain that the lifting methods used to lift the heater and the method of suspension used in the field installation of the heater are capable of uniformly supporting the weight of...

Страница 7: ...ity Gas Nominal Iron Internal Length of Pipe Feet meters Pipe Size Dia 10 20 30 40 50 60 70 80 90 100 125 150 175 200 in in 3 0 6 1 9 1 12 2 15 2 18 3 21 3 24 4 27 4 30 5 38 1 45 7 53 3 61 0 1 2 0 622...

Страница 8: ...Code in Canada according to CGA B149 See Tables 1 3 for correct gas piping size If gas pressure is excessive on natural gas applications install a pressure regulating valve in the line upstream from t...

Страница 9: ...re air Always refer to the thermostat instructions as well as our unit wiring diagram and wire accordingly Avoid mounting the thermostat in the following locations 1 Cold Areas Outside walls or areas...

Страница 10: ...10 ELECTRICAL CONNECTIONS continued Figure 5d Tubular Units Equipped with Natural Gas and Propane LP Gas...

Страница 11: ...11 ELECTRICAL CONNECTIONS continued Figure 5e Tubular Unit Sizes with Optional 2 Stage Ignition...

Страница 12: ...its in areas under negative pressure due to large exhaust fans or air conditioning When required a flue vent fan should be installed in accordance with the instructions included with the fan 10 Vent c...

Страница 13: ...et Adjacent public walkways 7 feet above grade The venting system for these appliances shall terminate at least 4 feet 1 2m below 4 feet 1 2m horizontal from or 1 foot 0 3m above any door window or gr...

Страница 14: ...odes or in the absence of local codes with current CGA B149 1 Installation Codes for Natural Gas Burning Appliances and Equipment or CGA B149 2 Installation Codes for Propane Gas Burning Appliances an...

Страница 15: ...15 Figure 8A Figure 8B VENTING continued...

Страница 16: ...16 VENTING continued Figure 9A Figure 9B...

Страница 17: ...e period ends the power venter motor is de energized 6 The fan operation is delayed 30 seconds once the thermostat is closed and continues operation for 30 seconds after the thermostat opens NOTICE Th...

Страница 18: ...unit heaters must be orificed to 90 of the normal altitude rating and be so marked in accordance with ETL certification Check the gas input rate as follows Refer to General Safety Information section...

Страница 19: ...ssure altitude of the unit installation and the technician s name and date on the label using a permanent marker Refer to Installation Instruction section on Adjustments Gas Input Rate for adjusting t...

Страница 20: ...t openings 3 Clean heat exchanger Refer to Installation 4 Determine cause and repair accordingly 1 Inspect all gas piping and repair 2 Check to ensure gas test ports are seated 3 Clean heat exchanger...

Страница 21: ...tat 1 Replace or tighten 2 Clean power ventor wheel 3 Realign power ventor wheel 1 Check and tighten wires on fan circuit 2 Test for 115v on terminal ACB Heat and L2 if voltage is present replace moto...

Страница 22: ...heat If not present and all checks are normal replace 1 Check power ventor circuit per wiring diagram 2 Check motor voltage and amp draw to motor name plate replace if motor found defective 3 Check f...

Страница 23: ...er 3 5 Amp fuse on circuit board 1 Common side of transformer grounded to chassis 2 Loose spark ignitor 1 Gas supply off or gas supply pressure too low 2 Flame sense rod contaminated or loose wire 3 G...

Страница 24: ...l safety devices supplied with your unit NOTICE The heater and vent system should be checked once a year by a qualified technician All Maintenance Service information should be recorded accordingly on...

Страница 25: ...ogenated hydrocarbons precipitated in the air d to any workmanship of the installer of the Product 3 This limited warranty is conditional upon a advising the installing contractor who in turn notify t...

Страница 26: ...ICATION OF PARTS PROPELLER UNIT HEATERS Figure 13 Heat Exchanger Assembly Figure 14 Electrical Control Panel Figure 11 Propeller Parts Figure 12 Component Parts D4430 Fan Guard Fan Blade Hardware Hard...

Страница 27: ...er Assembly 300 400 Unit Sizes Shown HOW TO ORDER REPLACEMENT PARTS Please send the following information to your local representative if further assistance is needed contact the manufacturer s custom...

Страница 28: ...n installed Do you understand all the controls on this equipment If not contact your wholesaler or rep DO NOT START this equipment unless you fully understand the controls GAS EQUIPMENT START UP GENER...

Отзывы: