7. Install the Top Track
Measure the distance (
″
A
″
) from wall to wall at the top of the wall jambs.
Mark the top track at the measured cutting dimension (
″
A
″
).
NOTE:
For best results use a 32-teeth per inch hacksaw and miter box.
Cut the top track on the inside edge of the mark [approximately 1/32
″
(1 mm) from the mark] to
allow space for the top track to slide into place easily.
Carefully file the rough edges smooth where the top track was cut, taking care to avoid damaging
finished surfaces.
Position the top track over the wall jambs and storage column and gently push down.
8. Install the Shelving Units and Hooks
Install each shelf by setting them down over two supports and pressing down.
On the shelf of your choice, clip the two hooks onto any portion of the front of the shelf.
Bottom Track
Wall Jamb
A
Outside of Bath
Inside of Bath
Top Track
Sterling
9
1035946-2-C
Содержание 6065
Страница 42: ...1035946 2 C ...
Страница 43: ...1035946 2 C ...
Страница 44: ...USA 1 800 STERLING 1 800 783 7546 México 001 877 680 1310 SterlingPlumbing com 2009 Kohler Co 1035946 2 C ...