5. Install the Storage Column
Position the bottom frame piece of the storage column over the bottom track assembly.
Slide the storage column into place in the chosen wall jamb.
Position the storage column so the shelves will be level.
NOTE:
The self drilling screws will create their own hole. No pilot hole is needed.
Position a #8 x 3/8
″
self drilling screw in each slot with the tip positioned in the groove in the
storage column frame and tighten.
6. Install the Center Jamb
Determine which end of the center jamb is shaped to fit over the bottom track.
Place the center jamb on the bottom track with the shaped side down and the slots to the inside of
the bath.
NOTE:
The self drilling screws will create their own hole. No pilot hole is needed.
Secure the center jamb in place with three #8 x 3/8
″
self drilling screws.
Bottom Track
Wall Jamb
Inside of
Bath
Outside
of Bath
Storage
Column
Bottom Track
Screw
Slot
Side View
Shaped End of
Center Jamb
Inside of
Shower
#8 x 3/8"
Self-Drilling
Screw
Center
Jamb
Wall Jamb
Outside
of Bath
Inside of Bath
1035946-2-C
8
Sterling
Содержание 6065
Страница 42: ...1035946 2 C ...
Страница 43: ...1035946 2 C ...
Страница 44: ...USA 1 800 STERLING 1 800 783 7546 México 001 877 680 1310 SterlingPlumbing com 2009 Kohler Co 1035946 2 C ...