background image

3

© Guldmann GB/US-1412/01/18 • # 30901020

© Guldmann GB/US-1412/01/18 • # 30901020

1 .00  

Purpose and use

1 .01  

Manufaturer

V. Guldmann A/S

Graham Bells Vej 21-23A

DK-8200 Aarhus N

Denmark

Tel.   + 45 8741 3100

Fax   + 45 8741 3131

1 .02  

Purpose and use

Purpose of the manual 

The manual describes the standard model with a lifting height from 0-3 metres.

Use

The LP8 is a vertical lifting platform designed for permanent installation indoors 

and outdoors. The lifting platform may be used in temperatures from -40° to 

+50°C. At temperatures below the freezing point a heating cable cassette 

(accessory) is recommended.

The lifting platform is designed to move individuals with limited mobility (e.g. 

the walking-impaired, wheelchair users, pram and sack trolley users, etc.) 

vertically from one level to another. Entry and exit is at opposite ends of the 

lifting platform. The lifting platform is designed and produced in accordance 

with current standards for negotiating height differences of up to 3 metres.

Great importance is attached to the design and implementation to achieve 

attractive and harmonious installation in different environments, private and 

public. Public environments are institutions, public buildings, etc., where the 

lifting platform is subject to a certain amount of supervision. In these environ-

ments, the lifting platform should be locked, protecting it against unintentional 

use or games.

When the lifting platform is in use, it is understood that the user has been 

instructed on its use, or that a skilled personnel is present to assist.

Assembly

The lifting platform is delivered ready-assembled from the factory. The 

platform must be mounted on a suitable and stable foundation. The  lifting 

platform must be installed by a qualified technician, in accordance with 

 Guldmann’s  instructions.

The motor housing must be placed in a suitable location to facilitate service 

and minimise noise.

Содержание LP8

Страница 1: ...GB US LP8 Lifting platform Vers 4 00...

Страница 2: ...2 02 Operating Instructions 6 2 03 Markings and symbols on the product 8 3 00 Connections 9 3 01 Electrical connections 9 4 00 Installation of accessories 10 5 00 Safety measures 10 6 00 Maintenance 1...

Страница 3: ...form is designed and produced in accordance with current standards for negotiating height differences of up to 3 metres Great importance is attached to the design and implementation to achieve attract...

Страница 4: ...s electronic parts that must also be disposed of in accord ance with applicable regulations 1 03 Important warnings Read the instructions carefully before using the product The LP8 must be assembled b...

Страница 5: ...20 1 04 Components 1 Lower door 2 Upper door 3 Access ramp 4 Control panel 5 Emergency lowering valve behind cover adjusting screw for emergency lowering 6 Production sign 7 Tower 8 Lift basket 9 Base...

Страница 6: ...at the lower level after use Operating instructions 1 Ensure that no one is situated at the doors as the doors open and close automatically 2 UP Press and hold the Up button in until the lifting platf...

Страница 7: ...red button until the platform reaches the lower level 3 The lower door can be opened when the lifting platform is in the lower posi tion 4 If the emergency lowering device has been used the cause must...

Страница 8: ...and inside the lift basket Emergency lowering instructions On the motor housing 1 The emergency lowering device is available behind the hatch 2 Ensure that no one is under the platform as the safety...

Страница 9: ...ly must be con nected to the terminal block located in a switch box in the motor housing The heating cable if mounted is also connected to the terminal block The heating cable can with advantage be eq...

Страница 10: ...tric cable of 3 metres Perforated steel Side plates of lift basket and doors are available in perfo rated steel instead of glass Remote control As an option the lifting platform can be supplied with i...

Страница 11: ...The emergency lowering device is locked in and is placed in the motor housing which is either behind the lifting platform or at the side depending on the cus tomer s requirements and available space...

Страница 12: ...ping on the lifting platforms floor and access ramp Great care must be taken when using the emergency lowering device 6 00 Maintenance Exercise caution while working beneath the platform as a crush ha...

Страница 13: ...and thereby preventing the lifting platform from going all the way down Cleaning The lifting platform can be cleaned with soap and water NB High pressure washers and scourers cannot be used Service in...

Страница 14: ...The emergency lowering device has been used Turn the adjusting screw for emergency lowering to its original position The lifting platform shows overload Remove some of the load from the lifting platfo...

Страница 15: ...parts Frequency 50Hz Phases 1 phase Circuit 10A fuses Voltage 230 Volt Control power 24 Volt Heating cable 220 Watt Doors Door motor 24 Volt DC Motor unit AC motor 1 1kW 230 Volts 1400 r min Operating...

Страница 16: ...the equipment which has been sub ject to damage or abuse by the user or others The warranty does not cover any part of the equipment which has been altered or changed in any way by the user or others...

Страница 17: ...17 Guldmann GB US 1412 01 18 30901020...

Страница 18: ...18 Guldmann GB US 1412 01 18 30901020...

Страница 19: ...19 Guldmann GB US 1412 01 18 30901020...

Страница 20: ...V Guldmann A S Tlf 45 8741 3100 Fax 45 8741 3131 E mail info guldmann com www stepless com Guldmann GB US 1412 01 18 30901020...

Отзывы: