13
■Cable synchronization
▶The cables ensure synchronization
between the carriage on the power post and
the carriage on the slave post.
① Top roller for cable.
② Synchronization cable from the
opposite carriage.
③ Synchronization cable mounting
bracket.
④ Bottom roller for cable.
Check which carriage first touches the
base plate of the post when the hoist descends
and then tighten. This cable until both carriages
lest on lie base plates simultaneously.
Adjusting the cables
How to check the tuning
adjustment.
① Check with "naked eyes" that the bottom
post reached simultaneously see above.
② Check with ears
Check the sound of the parking pawls
engaging in each slat during ascent.
The "clicks" should be simultaneously
if not tighten the cable on the later pawl.
(The wire of the locker that sounds later
shall be tightened more tensely.)
Installation
Содержание MOLNAR BRADBURY SB40
Страница 14: ...14 14 Installation Hydraulic Diagram LOWERING VALVE 9 16 18 UNF ...
Страница 15: ...15 Installation Electrical Diagram ...