16
Check Points Before Operation
■ Test Operation
Before loading the hoist check
the following points.
▶
Operate the hoist up and down 2-3 times to
check the full travel of the carriages.
■ Switch Operation
▶Check that the ascent and descent lever
operate correctly.
■ Hydraulic Check
▶Check that there are no hydraulic leaks
from either cylinders, pipes, or hose joints.
■ Mechanical Check
▶Check the tightness of all nuts, bolts, etc.
■ Exterior Check
▶
Check the exterior of the hoist to ensure
that there is no obvious damage.
■ Cleanliness
▶C
heck every day that the hoist and the
work area are clean and free from debris or
obstructions.
Operation
Содержание MOLNAR BRADBURY SB40
Страница 14: ...14 14 Installation Hydraulic Diagram LOWERING VALVE 9 16 18 UNF ...
Страница 15: ...15 Installation Electrical Diagram ...
Страница 23: ...23 Maintenance Troubleshooting 2 3 4 5 2 3 4 5 ...